5-166
G60 Generator Protection System
GE Multilin
5.6 GROUPED ELEMENTS
5 SETTINGS
5
Figure 5–71: PHASE DISTANCE ZONE 2 OP SCHEME
For phase distance zone 2, there is a provision to start the zone timer with other distance zones or loop the pickup
flag to avoid prolonging phase distance zone 2 operation when the fault evolves from one type to another or
migrates from the initial zone to zone 2. Desired zones in the trip output function should be assigned to accomplish
this functionality.
Figure 5–72: PHASE DISTANCE ZONES 3 AND HIGHER OP SCHEME
25
$1'
25
$&'5
IURPWKHRSHQSROHHOHPHQW'/DQG/RQO\
)/(;/2*,&23(5$1'
23(132/(23
)/(;/2*,&23(5$1'
3+',67=3.3$%
)/(;/2*,&23(5$1'
3+',67=3.3%&
)/(;/2*,&23(5$1'
3+',67=3.3&$
7,0(5
PV
PV
7,0(5
PV
PV
7,0(5
PV
PV
6(77,1*
3+',67='(/$<
7
3.3
6(77,1*
3+',67='(/$<
7
3.3
6(77,1*
3+',67='(/$<
7
3.3
)/(;/2*,&23(5$1'
3+',67=23$%
)/(;/2*,&23(5$1'
3+',67=23%&
)/(;/2*,&23(5$1'
3+',67=23&$
)/(;/2*,&23(5$1'
3+',67=23
)/(;/2*,&23(5$1'
75,3=3+705,1,7
25
25
25
$1'
25
$1'
25
$1'
$1'
$1'
IURPWKHWULSRXWSXWHOHPHQW
NOTE
25
$1'
$1'
$1'
25
25
25
$$&'5
'/DQG/RQO\
)/(;/2*,&23(5$1'
23(132/(23
)/(;/2*,&23(5$1'
3+',67=3.3$%
)/(;/2*,&23(5$1'
3+',67=3.3%&
)/(;/2*,&23(5$1'
3+',67=3.3&$
7,0(5
PV
PV
7,0(5
PV
PV
7,0(5
PV
PV
6(77,1*
3+',67='(/$<
7
3.3
6(77,1*
3+',67='(/$<
7
3.3
6(77,1*
3+',67='(/$<
7
3.3
)/(;/2*,&23(5$1'
3+',67=23$%
)/(;/2*,&23(5$1'
3+',67=23%&
)/(;/2*,&23(5$1'
3+',67=23&$
)/(;/2*,&23(5$1'
3+',67=23
Summary of Contents for Multilin g60
Page 10: ...x G60 Generator Protection System GE Multilin TABLE OF CONTENTS INDEX ...
Page 32: ...1 22 G60 Generator Protection System GE Multilin 1 5 USING THE RELAY 1 GETTING STARTED 1 ...
Page 160: ...4 30 G60 Generator Protection System GE Multilin 4 3 FACEPLATE INTERFACE 4 HUMAN INTERFACES 4 ...
Page 486: ...5 326 G60 Generator Protection System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Page 518: ...6 32 G60 Generator Protection System GE Multilin 6 5 PRODUCT INFORMATION 6 ACTUAL VALUES 6 ...
Page 532: ...7 14 G60 Generator Protection System GE Multilin 7 2 TARGETS 7 COMMANDS AND TARGETS 7 ...
Page 748: ...D 10 G60 Generator Protection System GE Multilin D 1 IEC 60870 5 104 APPENDIX D D ...
Page 760: ...E 12 G60 Generator Protection System GE Multilin E 2 DNP POINT LISTS APPENDIX E E ...