The report control configuration settings are shown below:
PATH: SETTINGS
PRODUCT SETUP
COMMUNICATIONS
IEC 61850 PROTOCOL
REPORT CONTROL CONFIGURATION
CONFIGURABLE REPORT 1
REPORT 1 DATASET ITEMS
To create the dataset for logical node LN, program the
ITEM 1
to
ITEM 64
settings to a value from the list of IEC 61850 data
attributes supported by the G60. Changes to the dataset will only take effect when the G60 is restarted. It is recommended
to use reporting service from logical node LLN0 if a user needs some (but not all) data from already existing GGIO1,
GGIO4, and MMXU4 points and their quantity is not greater than 64 minus the number items in this dataset.
REPORT 1
DATASET ITEMS
ITEM 1:
Range: all valid MMS data item references
MESSAGE
ITEM 2:
Range: as shown above
MESSAGE
ITEM 3:
Range: as shown above
↓
MESSAGE
ITEM 64:
Range: as shown above
Summary of Contents for Multilin g60
Page 10: ...x G60 Generator Protection System GE Multilin TABLE OF CONTENTS INDEX ...
Page 32: ...1 22 G60 Generator Protection System GE Multilin 1 5 USING THE RELAY 1 GETTING STARTED 1 ...
Page 160: ...4 30 G60 Generator Protection System GE Multilin 4 3 FACEPLATE INTERFACE 4 HUMAN INTERFACES 4 ...
Page 486: ...5 326 G60 Generator Protection System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Page 518: ...6 32 G60 Generator Protection System GE Multilin 6 5 PRODUCT INFORMATION 6 ACTUAL VALUES 6 ...
Page 532: ...7 14 G60 Generator Protection System GE Multilin 7 2 TARGETS 7 COMMANDS AND TARGETS 7 ...
Page 748: ...D 10 G60 Generator Protection System GE Multilin D 1 IEC 60870 5 104 APPENDIX D D ...
Page 760: ...E 12 G60 Generator Protection System GE Multilin E 2 DNP POINT LISTS APPENDIX E E ...