GE
D
IRECTION
5573152-100, R
EV
. 2
LOGIQ E9 S
ERVICE
M
ANUAL
Chapter 8 Replacement procedures
8 - 115
NOTICE
DO NOT connect the LCD power cable to the power (P3) connector on the Bulkhead when the
LOGIQ E9 is powered up. Damage to the LCD Power Cable and/or the Bulkhead Board can
occur. See images below of damage that can occur.
48VDC pin in the P3 connector (center pin), shows damage.
The outside two pins are Ground. Cable left, Bulkhead Connector right.
4.
Connect the LCD cables; video (
P10
) and
power (
P3
) from the LCD.
The Video Cable has a retainer and screw.
Tighten the screw with a small, flat blade
screwdriver.
Make sure the cables do not interfere with
the installation of the cables. It may be
necessary to push the cables up before
installing the Bulkhead Cover.
5.
Re-install the LCD Monitor.
Table 8-73 LCD Monitor V2 Arm assembly (Daeil) installation - R4 production
Steps
Corresponding Graphic
Summary of Contents for LOGIQ E9
Page 2: ......
Page 11: ...GE DIRECTION 5573152 100 REV 2 LOGIQ E9 SERVICE MANUAL xi ZH CN KO ...
Page 753: ......
Page 754: ......