GE
D
IRECTION
5573152-100, R
EV
. 2
LOGIQ E9 S
ERVICE
M
ANUAL
Chapter 3 LOGIQ E9 Setup
3 - 23
3-6-7
Power On/Boot Up
3-6-7-1
Warnings
NOTE:
Do not cycle the Circuit Breaker ON-OFF-ON in less than five seconds. When turning OFF the
Circuit Breaker, WAIT until the ON/OFF button is no longer lit. The LOGIQ E9 should de-
energize completely before turning the circuit breaker ON.
3-6-7-2
Detailed Procedure
For a detailed procedure, see:
4-2-2 "Power ON/Boot Up" on page 4-3
DANGER
ALWAYS CONNECT THE UNIT TO A FIXED POWER SOCKET WHICH HAS THE
PROTECTIVE GROUNDING CONNECTOR.
DANGER
NEVER USE A THREE-TO-TWO PRONG ADAPTER; THIS DEFEATS THE
SAFETY GROUND.
DANGER
ENSURE THAT THE POWER CORD AND PLUG ARE INTACT AND THAT THE
POWER PLUG IS THE PROPER HOSPITAL-GRADE TYPE (WHERE REQUIRED).
CAUTION
LOGIQ E9 REQUIRES ALL COVERS
OPERATE THIS UNIT ONLY WHEN ALL BOARD COVERS AND FRAME PANELS ARE
SECURELY IN PLACE. THE COVERS ARE REQUIRED FOR SAFE OPERATION, GOOD LOGIQ E9
PERFORMANCE AND COOLING PURPOSES.
NOTICE
Use only power supply cords, cables and plugs provided by or designated by GE.
Summary of Contents for LOGIQ E9
Page 2: ......
Page 11: ...GE DIRECTION 5573152 100 REV 2 LOGIQ E9 SERVICE MANUAL xi ZH CN KO ...
Page 753: ......
Page 754: ......