GE
D
IRECTION
5573152-100, R
EV
. 2
LOGIQ E9 S
ERVICE
M
ANUAL
Chapter 8 Replacement procedures
8 - 247
8-10-3-6
Calibration and adjustments
No calibrations or adjustments are needed after this part replacement.
8-10-3-7
Verification
Perform the following steps to verify that the product is functioning as intended after this replacement:
1.) Verify that all screws that you removed earlier have been installed.
2.) If finished, connect cables and Probes removed earlier.
3.) Power up the system to verify that it operates as intended.
8-10-3-8
Functional Checks
Perform the following functional checks to confirm the system is operational before returning the system
to the customer.
If all are successful, include the following debrief script: LOGIQ E9 Service Manual, Direction
5573152-100, Rev. 2. Equipment passed all required checks and is ready for use.
Table 8-156 Main Power Supply Fan Assembly replacement Functional Checks
See:
Section
Functional Check
Debrief Script
LOGIQ E9 Service Manual, Direction
5573152-100, Rev. 2. Equipment passed all
required checks and is ready for use.
Perform a 4D sweep
Let the LOGIQ E9 run for 10 minutes and
observe that the Fans are running and
there are no errors reported by the
LOGIQ E9.
Summary of Contents for LOGIQ E9