GE
D
IRECTION
5573152-100, R
EV
. 2
LOGIQ E9 S
ERVICE
M
ANUAL
8 - 240
Section 8-10 - Main Power Supply parts replacement
1.
Reconnect the Mains PS Cable and all
cables -
AC Output to Peripherals, Printer, Power to
BEP and USB on top of the Main PS.
If the Shear Wave option is installed,
reconnect the cable that supplies voltage to
the Capacitor Pack.
(Cherokee/Mitra) PS connectors
(Lambda) PS connectors without Shear Wave option
(R4 and earlier)
(Lambda) PS connectors with Shear Wave option
(R5 and later)
PCIe Cable routed between Card Cage and Frame (right side
view). GFI Configuration only. MRX does not use this cable.
2.
Install the Rear Cover, Top Cover and Side Covers.
3.
Perform Functional Checks. See:
8-10-2-3 - Calibration and adjustments
and
8-10-2-5 "Functional Checks" on page 8-241
.
Table 8-152 Main PS installation
Steps
Corresponding Graphic
Summary of Contents for LOGIQ E9
Page 2: ......
Page 11: ...GE DIRECTION 5573152 100 REV 2 LOGIQ E9 SERVICE MANUAL xi ZH CN KO ...
Page 753: ......
Page 754: ......