D
IRECTION
5573152-100, R
EV
. 2
LOGIQ E9 S
ERVICE
M
ANUAL
Chapter 4 Functional Checks
4 - 5
4-2-2-3
Turn Unit ON
1.) Switch ON the Mains Power Circuit Breaker at the rear of the unit. The
ON
/
OFF
button will become
amber.
You should hear a “click” from the relays in the AC Power and the unit is ready to boot. The
ON
/
OFF
button will remain amber.
2.) Press once on the
ON/OFF
button on the Operator Panel to boot the unit. The
ON
/
OFF
button will
turn green when it is pressed.
During a normal boot, you may observe that:
a.) The unit’s ventilation fan starts on full speed, but slows down after a few seconds (listen to the
fan sound).
b.) Power is distributed to the peripherals, Operator Panel (Console), Monitor, Front End
Processor and Back End Processor.
c.) Back End Processor and rest of scanner starts with the sequence listed in the next steps:
d.) Back End Processor is turned ON and starts to load the software.
e.) The Start Screen is displayed on the monitor.
f.) A start-up bar indicating the time used for software loading, is displayed on the monitor.
g.) The software initiates and sets up the Front End electronics and the rest of the instrument.
h.) The backlight in the keyboard is lit.
i.) As soon as the software has been loaded, either a 2D screen is displayed on the screen,
indicating that a probe has been connected, or a No Mode screen is displayed, indicating that
no probe has been connected.
NOTE:
Total time used for start-up is typically one and a half minutes or less. If starting after a power
loss or a lock-up, the start-up time may be up to four minutes.
Figure 4-2 The Circuit breaker and ON/OFF button
Summary of Contents for LOGIQ E9
Page 2: ......
Page 11: ...GE DIRECTION 5573152 100 REV 2 LOGIQ E9 SERVICE MANUAL xi ZH CN KO ...
Page 753: ......
Page 754: ......