GE
D
IRECTION
5573152-100, R
EV
. 2
LOGIQ E9 S
ERVICE
M
ANUAL
8 - 130
Section 8-6 - Replacing Top Console Parts
8-6-4-2
V2 Monitor Arm Assembly Adapter installation
Table 8-80 V2 Arm Adapter installation
Steps
Corresponding Graphic
1.
Early R5 production and earlier
:
Insert the Adapter into the Frame UI Upper
Assembly.
Align the mounting holes and install the two
M5 x 50 hex key screws using a 4 mm Hex
Key to secure the Adapter. Torque 2.5 Nm
(1.8 lbf-ft {21.6 lbf-in}).
NOTE: Note the shape of the rear
mounting hole, this is important for the
next step before the Thrust Plate is
installed.
(
rear of LOGIQ E9
)
(
Op Panel, front of LOGIQ E9)
2.
NOTE: MAKE SURE the rear mounting
hole for the Arm Neck Lock Pin, in the Trust
Plate is aligned with the rear mounting hole
of the Adapter BEFORE installing the
Plate. If the Plate is installed incorrectly, it
may be very difficult to remove.
Align the rear mounting hole for the Arm
Neck Lock Pin, in the Trust Plate with the
rear mounting hole of the Adapter.
Seat the Plate. The plate will be captured
by the two retaining pins that protrude from
the Adapter.
3.
Later R5 production and later
:
NOTE: Note the shape of the REAR
mounting hole, this is important for when
the UI Boss Bearing is installed.
(
rear of LOGIQ E9
)
(
Op Panel, front of LOGIQ E9)
Summary of Contents for LOGIQ E9
Page 2: ......
Page 11: ...GE DIRECTION 5573152 100 REV 2 LOGIQ E9 SERVICE MANUAL xi ZH CN KO ...
Page 753: ......
Page 754: ......