GE
D
IRECTION
5573152-100, R
EV
. 2
LOGIQ E9 S
ERVICE
M
ANUAL
Chapter 8 Replacement procedures
8 - 35
8-5-5
Top Cover replacement
8-5-5-1
Top Cover removal
Table 8-10 Manpower / Time and Tools
Manpower /
Time
Tools
One person /
15 minutes
Refer to:
8-2-5 "Tools needed for servicing the LOGIQ E9" on page 8-5
Table 8-11 Preparations and Preparation Links
Preparations - you must perform the following steps
1. Power down the system.
2. Disconnect the mains power cable from the wall outlet and all Probes and External I/O Cabling.
3. Remove Side Covers.
Preparation Links (if you need more information):
•
4-2-3 "Power shut down" on page 4-6.
• 8-5-3 "Side Covers replacement" on page 8-28.
Table 8-12 Top Cover removal
(Top Cover Screw placement as seen from above.)
Steps
Corresponding Graphic
1.. Remove the two screws that secure the Top
Cover.
Remove the Top Cover and gently pull back
and up.
Re-installed to the screws to avoid damage
to the Rear Handle.
Summary of Contents for LOGIQ E9
Page 2: ......
Page 11: ...GE DIRECTION 5573152 100 REV 2 LOGIQ E9 SERVICE MANUAL xi ZH CN KO ...
Page 753: ......
Page 754: ......