Chapter 8 Replacement procedures
8 - 125
8-6-3-4
Calibration and adjustments
Refer to:
Section 6-2 "Monitor adjustments" on page 6-1
for Monitor calibration instructions and/or
Monitor Arm and Monitor Friction Adjustment.
8-6-3-5
Verification
Perform the following steps to verify that the product is functioning as intended after this replacement:
1.) Verify that all screws removed earlier have been installed.
2.) If finished, connect cables and Probes removed earlier.
3.) Power up the system to verify that it operates as intended.
4.) Move the Monitor Arm from side to side and ensure that it moves as intended.
8-6-3-6
Functional Checks
Perform the following functional checks to confirm the system is operational before returning the system
to the customer.
If all are successful, include the following debrief script: LOGIQ E9 Service Manual, Direction
5573152-100, Rev. 2. Equipment passed all required checks and is ready for use.
Table 8-76 Monitor Arm assembly replacement Functional Checks
See
Section
Functional Check
Debrief Script
LOGIQ E9 Service Manual, Direction
5573152-100, Rev. 2. Equipment passed all
required checks and is ready for use.