GE
D
IRECTION
5573152-100, R
EV
. 2
LOGIQ E9 S
ERVICE
M
ANUAL
8 - 168
Section 8-6 - Replacing Top Console Parts
2. On the bottom side of the Lower
Bezel, pull through the elastomer
guides until they lock in.
Double check that all 16 elastomer
guides (anchors) are pulled through
all the way, or else it will not seat
properly.
Install the Trackball.
Reattach the Power and USB
cables.
Elastomer Guides - top view (not
all elastomer anchors are identified
3. When replacing the Lower Op
Panel Bezel:
• Make sure that carriers, buttons,
knobs are all in place before setting
the Lower Op Panel Board on top of
the Lower Bezel.
• Ensure that the board is flat on top
of the bezel. Put a few screws in,
then flip it over to make sure none of
the buttons are ‘cocked,’ or out of
place.
• Replace the remaining screws.
D. Replace the TGC dust gasket.
The clear, plastic backing must be
facing down when the bezel is
installed. (The clear, plastic backing
should be facing up from this view.)
Lower Op Panel Board and Lower Bezel
Table 8-112 Elastomer Lower Op Panel Replacement
Steps
Corresponding Graphic
Summary of Contents for LOGIQ E9
Page 2: ......
Page 11: ...GE DIRECTION 5573152 100 REV 2 LOGIQ E9 SERVICE MANUAL xi ZH CN KO ...
Page 753: ......
Page 754: ......