GE
D
IRECTION
5573152-100, R
EV
. 2
LOGIQ E9 S
ERVICE
M
ANUAL
8 - 114
Section 8-6 - Replacing Top Console Parts
2.
Take the LCD Arm and Cable Assembly
and feed the LCD Power Cable into the
Adapter first.
Position the Video Cable Connector as
shown and continue to feed the cables into
the Adapter.
Install the Arm Assembly.
3.
Position the Arm Assembly so the Set
Screw mounting hole faces the left side of
the LOGIQ E9.
Install the Set Screw. Torque: 9.8 Nm
(7.2 lbf-ft {86.4 lbf-in}).
Table 8-73 LCD Monitor V2 Arm assembly (Daeil) installation - R4 production
Steps
Corresponding Graphic
Summary of Contents for LOGIQ E9
Page 2: ......
Page 11: ...GE DIRECTION 5573152 100 REV 2 LOGIQ E9 SERVICE MANUAL xi ZH CN KO ...
Page 753: ......
Page 754: ......