Chapter 4 Functional Checks
4 - 43
Section 4-4
Application Turnover Check List
Complete these checks before returning the scanner to customer for use:
4-4-1
Software Configuration Checks
Section 4-5
Power supply test and adjustments
4-5-1
Power Supply Test Procedure
Run the System Voltage test. Refer to
Table 4-20 Software Configuration Checks
STEP
TASK
CHECK (
)
1.
Check Date and Time setting
2.
Check that Location (Hospital Name &
Department) is correct
3.
Check Language settings
4.
Check assignment of Printer Keys
P1
P2
P3
P4
5.
Check that all of the customer’s options are
correctly installed