Section 8-6 - Replacing Top Console Parts
8-6-3-1 LCD Arm (Original) replacement - R3.x and earlier (cont’d)
Table 8-71 LCD Arm assembly (Original) installation
Steps
Corresponding Graphic
1.
Carefully install the LCD Arm assembly into
position, first feeding the LCD Arm cables
down through the console opening.
Push the LCD Mount Lock handle (
1
) into
the locked position (shown LOCKED).
DO NOT adjust nut (
2
).
LCD Mount Lock Handle
NOTICE
DO NOT connect the LCD power cable to the power (P3) connector on the Bulkhead when the
LOGIQ E9 is powered up. Damage to the LCD Power Cable and/or the Bulkhead Board can
occur. See images below of damage that can occur.
48VDC pin in the P3 connector (center pin), shows damage.
The outside two pins are Ground. Cable left, Bulkhead Connector right.
2.
Connect the LCD cables; video (
P10
) and
power (
P3
) from the connectors on the
Bulkhead. The Gel Warmer cable (
P1
)
does not have to be removed.
Install the Bulkhead Cover.
Install the LCD Monitor assembly.
LCD Cables at Bulkhead
3.
Perform Functional Checks. See:
8-6-3-4 - Calibration and adjustments
,
and
8-6-3-6 "Functional Checks" on page 8-125
.