
Operation of binder dosing system
BOMAG
88
MPH 122-2
Fig. 184
l
Close the middle spraying section (n) (Fig.
183) once the binder pump pressure gauge (d)
(Fig. 184) and the spraying bar pressure
gauge (a) show increasing pressure.
Starting work
Fig. 185
l
Set the selector switch for spraying/circulation
(k) (Fig. 185) to position "Circulation".
l
Preselect the sections on the spraying bar (n).
l
Set the binder quantity potentiometer (m) to
medium flow.
l
Start milling.
l
Set the selector switch for spraying/circulation
(k) to position "Spraying".
l
If necessary regulate the medium flow with the
binder quantity potentiometer (m)..
Interrupting work
l
Set the selector switch for spraying/circulation
(k) to position "Circulation".
All nozzles of the opened sections are closed.
i
Note
For longer breaks set the binder pump to a lower
flow rate, to keep the binder circulating.
Changing the binder
!
Danger
If you want to change to hot bitumen, the spray
bar needs to be completely emptied before-
hand.
The water proportion in the emulsion will oth-
erwise evaporate and cause a tremendous
pressure increase in the system, which may
damage the system and injure persons!
l
Completely drain the bitumen system, see
chapter "Blowing out bitumen system and
spray bar".
Summary of Contents for Bomag MPH 122-2
Page 2: ......
Page 8: ...Table of Contents BOMAG 8 MPH 122 2...
Page 9: ...BOMAG 9 MPH 122 2 1 Technical Data...
Page 13: ...BOMAG 13 MPH 122 2 2 Safety regulations...
Page 24: ...Safety regulations BOMAG 24 MPH 122 2...
Page 25: ...BOMAG 25 MPH 122 2 3 Indicators and Controls...
Page 26: ...Indicators and Controls BOMAG 26 MPH 122 2...
Page 27: ...Indicators and Controls BOMAG 27 MPH 122 2 Fig 9 Fig 10...
Page 49: ...BOMAG 49 MPH 122 2 4 Operation...
Page 82: ...Operation BOMAG 82 MPH 122 2...
Page 83: ...BOMAG 83 MPH 122 2 5 Operation of binder dosing system...
Page 95: ...BOMAG 95 MPH 122 2 6 Maintenance...
Page 124: ...Every 10 operating hours BOMAG 124 MPH 122 2...
Page 130: ...Every 50 operating hours BOMAG 130 MPH 122 2...
Page 172: ...Every 4000 operating hours BOMAG 172 MPH 122 2...
Page 189: ...BOMAG 189 MPH 122 2 7 Trouble shooting...
Page 197: ......
Page 198: ......