
Safety regulations
BOMAG
14
MPH 122-2
General
This BOMAG machine has been built in com-
pliance with the latest technical standard and
complies with the applicable regulations and
technical rules. However, dangers for persons
and property may arise from this machine, if:
l
it is used for purposes other than the ones it is
intended for,
l
it is operated by untrained personnel,
l
it is changed or converted in an unprofessional
way,
l
the safety instructions are not observed.
Each person involved in the operation, mainte-
nance and repair of the machine must there-
fore read and comply with these safety
regulations. If necessary, this must be con-
firmed by obtaining the signature of the cus-
tomer.
Furthermore, the following obviously also applies:
l
applicable accident prevention instructions,
l
generally accepted safety and road traffic reg-
ulations,
l
country specific safety regulations. It is the
duty of the operator to be acquainted with
these instructions and to apply these accord-
ingly. This applies also for local regulations
concerning different types of handling work.
Should the recommendations in these instruc-
tions be different from the regulations valid in
your country, you must comply with the safety
regulations valid in your country.
Intended use
This machine must only be used for:
l
Stabilizing in road construction to improve and
reinforce existing soil materials by mixing in
lime, fly ash or cement.
l
Milling and pulverizing old, damaged bitumen
road surface layers and road reinforcements,
l
Metered application of water, bitumen emul-
sion or foam bitumen
*
.
Unintended use
Dangers may arise from the machine when it is
used for purposes other than the one it is intended
for.
Any danger caused by intended use is the sole re-
sponsibility of the customer or driver/operator, the
manufacturer cannot be made liable.
Examples for unintended use are:
l
using the machine as recovery vehicle
l
using the machine as towing vehicle for trans-
ports
l
driving on surfaces with insufficient load bear-
ing capacity or on hard shoulders - danger of
slipping down embankments
l
connection of accompanying vehicles (water
or bitumen) without tow bar
l
conversion from emulsion operation to bitu-
men operation without cleaning the sywstem -
danger of explosion
Climbing onto or off the machine while driving is
prohibited.
Transporting persons, except the machine driver,
is prohibited.
Starting and operation of the machine in explosive
environments and in underground mining is pro-
hibited.
Remaining dangers, remaining risks
Despite careful work and compliance with stand-
ards and regulations it cannot be ruled out that fur-
ther dangers may arise when working with and
handling the machine.
Both the machine as well as all other system com-
ponents comply with the currently valid safety reg-
ulations. Nevertheless, remaining risks cannot be
ruled out completely, even when using the ma-
chine for the purpose it is intended for and follow-
ing all information given in the operating
instructions.
A remaining risk can also not be excluded beyond
the actual danger zone of the machine. Persons
remaining in this area must pay particular attention
to the machine, so that they can react immediately
in case of a possible malfunction, an incident or
failure etc.
All persons remaining ion the area of the machine
must be informed about the dangers that arise
from the operation of the machine.
*
Optional equipment
Summary of Contents for Bomag MPH 122-2
Page 2: ......
Page 8: ...Table of Contents BOMAG 8 MPH 122 2...
Page 9: ...BOMAG 9 MPH 122 2 1 Technical Data...
Page 13: ...BOMAG 13 MPH 122 2 2 Safety regulations...
Page 24: ...Safety regulations BOMAG 24 MPH 122 2...
Page 25: ...BOMAG 25 MPH 122 2 3 Indicators and Controls...
Page 26: ...Indicators and Controls BOMAG 26 MPH 122 2...
Page 27: ...Indicators and Controls BOMAG 27 MPH 122 2 Fig 9 Fig 10...
Page 49: ...BOMAG 49 MPH 122 2 4 Operation...
Page 82: ...Operation BOMAG 82 MPH 122 2...
Page 83: ...BOMAG 83 MPH 122 2 5 Operation of binder dosing system...
Page 95: ...BOMAG 95 MPH 122 2 6 Maintenance...
Page 124: ...Every 10 operating hours BOMAG 124 MPH 122 2...
Page 130: ...Every 50 operating hours BOMAG 130 MPH 122 2...
Page 172: ...Every 4000 operating hours BOMAG 172 MPH 122 2...
Page 189: ...BOMAG 189 MPH 122 2 7 Trouble shooting...
Page 197: ......
Page 198: ......