
Operation
BOMAG
50
MPH 122-2
4.1
General
If you are not yet acquainted with the controls
and indicating elements on this machine you
should thoroughly read chapter 3 “Indicators
and control elements” before starting work.
All indicators and control elements are de-
scribed in detail in this chapter.
4.2
Tests before taking into op-
eration
Before the everyday use or before a longer work-
ing period the following tests and inspections must
be performed.
!
Danger
Danger of accident!
Please observe strictly the safety regulations
in chapter 2 of this instruction manual!
l
Park the machine on ground as level as possi-
ble.
Check:
l
fuel tank and fuel lines for leaks
l
screw joints for tight fit
l
function of steering
l
function of brakes
l
function of emergency stop
l
hydraulic oil tank and lines for leaks
l
engine and machine for condition, cleanliness,
damage
l
Presence of the appropriate operating and
maintenance instructions
l
proper maintenance of the machine
l
service doors closed and locked
i
Note
For a description of the following tasks refer to the
chapter "maintenance every 10 operating hours".
l
Engine oil level, top up if necessary
l
Fuel level, top up if necessary.
l
Hydraulic oil level, top up if necessary.
l
Coolant level, top up if necessary
l
State of cutting teeth, replace if necessary
l
Air pressure in front and rear tires
l
Lateral hood boxes for dirt
l
Dirt scrapers on hydraulic cylinders for dirt
l
Intercooler for dirt
Summary of Contents for Bomag MPH 122-2
Page 2: ......
Page 8: ...Table of Contents BOMAG 8 MPH 122 2...
Page 9: ...BOMAG 9 MPH 122 2 1 Technical Data...
Page 13: ...BOMAG 13 MPH 122 2 2 Safety regulations...
Page 24: ...Safety regulations BOMAG 24 MPH 122 2...
Page 25: ...BOMAG 25 MPH 122 2 3 Indicators and Controls...
Page 26: ...Indicators and Controls BOMAG 26 MPH 122 2...
Page 27: ...Indicators and Controls BOMAG 27 MPH 122 2 Fig 9 Fig 10...
Page 49: ...BOMAG 49 MPH 122 2 4 Operation...
Page 82: ...Operation BOMAG 82 MPH 122 2...
Page 83: ...BOMAG 83 MPH 122 2 5 Operation of binder dosing system...
Page 95: ...BOMAG 95 MPH 122 2 6 Maintenance...
Page 124: ...Every 10 operating hours BOMAG 124 MPH 122 2...
Page 130: ...Every 50 operating hours BOMAG 130 MPH 122 2...
Page 172: ...Every 4000 operating hours BOMAG 172 MPH 122 2...
Page 189: ...BOMAG 189 MPH 122 2 7 Trouble shooting...
Page 197: ......
Page 198: ......