
Operation
BOMAG
68
MPH 122-2
Fig. 127
l
The control light for load limit control (e) in the
instrument cluster for machine functions (Fig.
127) flashes slowly.
!
Caution
If the display of the load limit sensing control
flashes rapidly, the machine has reached its
load limit.
Reduce the load by manual intervention.
4.14 Adjusting the tailgate
i
Note
Adjust the tailgate only when driving forward.
Fig. 128
l
Operate lever (Fig. 128) to open or close the
tailgate so far, that the ground is correctly lev-
elled.
i
Note
The opening values depend on: - the cutting
depth, - the condition of the soil.
Fig. 129
l
Observe the opening indicator for the tailgate
(Fig. 129).
Summary of Contents for Bomag MPH 122-2
Page 2: ......
Page 8: ...Table of Contents BOMAG 8 MPH 122 2...
Page 9: ...BOMAG 9 MPH 122 2 1 Technical Data...
Page 13: ...BOMAG 13 MPH 122 2 2 Safety regulations...
Page 24: ...Safety regulations BOMAG 24 MPH 122 2...
Page 25: ...BOMAG 25 MPH 122 2 3 Indicators and Controls...
Page 26: ...Indicators and Controls BOMAG 26 MPH 122 2...
Page 27: ...Indicators and Controls BOMAG 27 MPH 122 2 Fig 9 Fig 10...
Page 49: ...BOMAG 49 MPH 122 2 4 Operation...
Page 82: ...Operation BOMAG 82 MPH 122 2...
Page 83: ...BOMAG 83 MPH 122 2 5 Operation of binder dosing system...
Page 95: ...BOMAG 95 MPH 122 2 6 Maintenance...
Page 124: ...Every 10 operating hours BOMAG 124 MPH 122 2...
Page 130: ...Every 50 operating hours BOMAG 130 MPH 122 2...
Page 172: ...Every 4000 operating hours BOMAG 172 MPH 122 2...
Page 189: ...BOMAG 189 MPH 122 2 7 Trouble shooting...
Page 197: ......
Page 198: ......