
Operation
BOMAG
76
MPH 122-2
Fig. 155
l
Remove the support rod (Fig. 155) with bolt (4)
and spring clip (2).
Fig. 156
!
Danger
Always secure the cabin with support rod, bolt
and spring clip.
l
Assemble the support rod (1) (Fig. 156) and
secure it with bolt and spring clip.
l
Remove the support rod and store it in the cor-
responding bracket before lowering the cabin.
Fig. 157
l
Turn the lever on hydraulic hand pump (Fig.
157) to the left.
The cabin moves down.
Fig. 158
l
Screw the fastening screws (2) into the cabin
(Fig. 158) and tighten them.
l
Connect the water hose (1).
Summary of Contents for Bomag MPH 122-2
Page 2: ......
Page 8: ...Table of Contents BOMAG 8 MPH 122 2...
Page 9: ...BOMAG 9 MPH 122 2 1 Technical Data...
Page 13: ...BOMAG 13 MPH 122 2 2 Safety regulations...
Page 24: ...Safety regulations BOMAG 24 MPH 122 2...
Page 25: ...BOMAG 25 MPH 122 2 3 Indicators and Controls...
Page 26: ...Indicators and Controls BOMAG 26 MPH 122 2...
Page 27: ...Indicators and Controls BOMAG 27 MPH 122 2 Fig 9 Fig 10...
Page 49: ...BOMAG 49 MPH 122 2 4 Operation...
Page 82: ...Operation BOMAG 82 MPH 122 2...
Page 83: ...BOMAG 83 MPH 122 2 5 Operation of binder dosing system...
Page 95: ...BOMAG 95 MPH 122 2 6 Maintenance...
Page 124: ...Every 10 operating hours BOMAG 124 MPH 122 2...
Page 130: ...Every 50 operating hours BOMAG 130 MPH 122 2...
Page 172: ...Every 4000 operating hours BOMAG 172 MPH 122 2...
Page 189: ...BOMAG 189 MPH 122 2 7 Trouble shooting...
Page 197: ......
Page 198: ......