WARNING
Leak testing
All gas connections must be properly leak tested at installation.
Do not turn on gas until you have completely checked the carrier lines for leaks.
WARNING
EXPLOSION HAZARD
Failure to follow this warning may result in injury or death to personnel.
Do not turn on sample gas until you have completely checked the carrier lines for
leaks.
•
Use stainless steel tubing to convey carrier gas.
•
Use a dual-stage regulator with high-side capacity of 3,000 psig (206.84 barg)
and low-side capacity of 150 psig (10.34 barg).
•
Carrier gas is fed from two bottles for carrier gas plumbing.
3. Connect calibration standard gas to the GC.
When installing the calibration standard gas line, ensure that the correct tubing
connection is made.
•
Use
⅛
-in stainless steel tubing to connect calibration standard gas unless the
application requires treated tubing.
•
Use a dual-stage regulator with low-side capacity of up to 30 psig (2.07 barg).
Reference Manual
Installation and start-up
2-3-9000-744
June 2022
Rosemount 700XA
61
Summary of Contents for Rosemount 700XA
Page 1: ...Reference Manual 2 3 9000 744 Rev L June 2022 Rosemount 700XA Gas Chromatograph ...
Page 6: ...TxD TD or Sout Transmit data or signal out 6 ...
Page 30: ...Overview Reference Manual June 2022 2 3 9000 744 30 Emerson com Rosemount ...
Page 100: ...Installation and start up Reference Manual June 2022 2 3 9000 744 100 Emerson com Rosemount ...
Page 182: ...Operation and maintenance Reference Manual June 2022 2 3 9000 744 182 Emerson com Rosemount ...
Page 280: ......
Page 281: ......
Page 282: ......
Page 293: ......