B
Carrier gas installation and
maintenance
This appendix provides a description of the optional carrier manifold (P/N 2-3-5000-050)
that permits the connection of two carrier gas bottles, or cylinders, to a gas
chromatograph (GC) system.
B.1
Carrier gas
The benefits of this manifold are as follows:
Note
The illustration and information in this appendix are adapted from drawing AE-10098.
•
When one bottle is nearly empty (i.e., 110 psig [758.4 kPa] remaining), the other bottle
becomes the primary supply.
•
You can disconnect each bottle for refilling without interrupting gas chromatograph
(GC) operation.
Figure B-1: Manifold for two carrier gas bottles to GC system
A. Analyzer
B. Carrier cylinder
Reference Manual
Carrier gas installation and maintenance
2-3-9000-744
June 2022
Rosemount 700XA
263
Summary of Contents for Rosemount 700XA
Page 1: ...Reference Manual 2 3 9000 744 Rev L June 2022 Rosemount 700XA Gas Chromatograph ...
Page 6: ...TxD TD or Sout Transmit data or signal out 6 ...
Page 30: ...Overview Reference Manual June 2022 2 3 9000 744 30 Emerson com Rosemount ...
Page 100: ...Installation and start up Reference Manual June 2022 2 3 9000 744 100 Emerson com Rosemount ...
Page 182: ...Operation and maintenance Reference Manual June 2022 2 3 9000 744 182 Emerson com Rosemount ...
Page 280: ......
Page 281: ......
Page 282: ......
Page 293: ......