2. Install the long bolts and spacers.
3. Place nuts and washers on the lower bolts.
4. Install the small plate just tightly enough to hold its position, with the small plate’s
U-bolt about 6.88 in (174.8 mm) below the large plate’s U-bolt.
5. Hold the matching spacer in place with the bolts installed loosely.
6. Orient the GC so that the notches in the mounting ears can be placed over the
lower bolts on the plate and then add the washers and nuts.
7. Place the nuts with washers on the upper bolts and then tighten all bolts.
8. Adjust the lower bracket to align the bolts with the plate. Tighten the bolts.
4.2.3
Mount the gas chromatograph (GC) on the floor
If you specify
Floor Mount
in the sales order, Emerson sends the floor mounting
arrangement pre-assembled with the GC.
The arrangement includes an additional support stand that is intended to be anchored to a
floor or an instrument pad. The base rails have holes that are 13.625 in (346 mm) apart,
side to side, and 16.75 in (425.4 mm) apart front to back. The holes are 0.5 in (13 mm) in
diameter and will accept up to 0.4375 in (11 mm) bolts.
Figure 4-3: GC mounted on floor
Installation and start-up
Reference Manual
June 2022
2-3-9000-744
50
Emerson.com/Rosemount
Summary of Contents for Rosemount 700XA
Page 1: ...Reference Manual 2 3 9000 744 Rev L June 2022 Rosemount 700XA Gas Chromatograph ...
Page 6: ...TxD TD or Sout Transmit data or signal out 6 ...
Page 30: ...Overview Reference Manual June 2022 2 3 9000 744 30 Emerson com Rosemount ...
Page 100: ...Installation and start up Reference Manual June 2022 2 3 9000 744 100 Emerson com Rosemount ...
Page 182: ...Operation and maintenance Reference Manual June 2022 2 3 9000 744 182 Emerson com Rosemount ...
Page 280: ......
Page 281: ......
Page 282: ......
Page 293: ......