GB
30
English
Use and maintenance instructions
Electric submersible pumps for sewage
5.3.2 THREE-PHASE ELECTRIC PUMPS
Protection carried out by end user through a control panel in
compliance with characteristics reported at par. 5.3 and able to
assure a reliable lasting running.
Series DIG only are equipped with thermal and control switch
with automatic restarting protecting winding against sudden and
temporary overheating.
Starting equipment, when necessary, must be in compliance with
regulations and rules in force.
The following protection devices by care of installer assure more
safety both for the users and for the electric pump:
-
Main switch with suitable sized fuses
- Contactor with thermal realy properly dimensioned to motor power
- Low level device against dry running by floating switch or electrodes
- Minimum voltage relay against phase failure (optional)
- Ammeter, Voltmeter and frequency-meter (optional)
Electric connection scheme for three-phase electric pumps, fig. 9-10-11
5.3.3 ELECTRIC CABLE
In case it should be necessary to extend the length of the electric cable
verify the good quality and the correct section in relation with the length
and the motor power.
The connection must be executed by care of skilled personnel and with
materials that guarantee a perfect insulation of conductors, tightness and
impermeableness lasting in time.
The eventual replacement of electric cable must be carried out by skilled
personnel using electric cable H07RN-F. The cable is suitable for
connection type M according to normatives EN-ì 60335-1 (CEI 61-50).
5.3.4 CHECKING THE ROTATION DIRECTION
(THREE-PHASE ELECTRIC PUMP)
The single phase electric pump rotates always in the correct direction.
In case of wrong rotation direction stop immediately the electric pump and inform
the distributor or the Technical office.
Check the exact rotation direction of three-phase electric pumps proceeding as
follows:
- Slightly tilt the pump to one side or hang it from a lifting means;
- Start the electric pump for a few seconds, making sure that the kick-back
does not become a danger hazard;
- The correct direction is indicated by harrows on the electric pump cover and
pump body. If the kick-back has been anticlockwise viewing the electric pump
from above, then the rotation direction is correct (fig.12)
If the rotation direction is wrong, disconnect the power supply and reconnect the
electric pump to the main by switching two of the three phases with each other.
The rotation direction must be checked again every time the electric pump is
electrically disconnected or an intervention is necessary in case of phase failure.
Attention ! The running on wrong rotation direction causes an overload to the
motor and heavy damages to the electric pump.
5.3.5 ELECTRIC PUMP PROTECTIONS
In special working conditions and on demand, the electric pumps series
FEKA - FEKA RC can be supplied with bimetallic thermal probles in the
motor winding and with sensor probes assuring protection against water
ingress into oil chamber.
L1
L2
L3
FU1
K1
K3
K2
1 3
5
6
4
2
U1 V1 W1
W1 U1 V1
1 3
5
6
4
2
1 3
5
6
4
2
U1
V1
W1
W2
U2
V2
Fig. 11
Connection scheme
for star-delta starting
Reaction
Fig. 13
Thermal probe connection
Electric supply
50-60 Hz
24V AC
Oil
probe
Thermal
probe
Pump control switch
Wire numeration
Oil and thermal probe
control relay
Fig. 10
Connection scheme for direct starting
Star connection
Yellow/green
Brown
Black
Blue
Yellow/green
Brown
Brown
Black
Black
Blue
Blue
Delta connection
Fig. 12
Summary of Contents for GRINDER GL
Page 2: ......
Page 4: ......
Page 21: ...Note...
Page 22: ......
Page 39: ...Notes...
Page 40: ......
Page 57: ...Notes...
Page 58: ......
Page 75: ...Notizen...
Page 76: ......
Page 93: ...Notas...
Page 94: ......
Page 111: ...Notities...
Page 112: ......
Page 115: ...115 RU i EN 60335 1 02 I 70 3 3 1 6 11 2 1 Dab Pumps 40 C 104 F 8 FEKA GRINDER...
Page 117: ...117 RU 4 4 1 125 127 10 4 2 5 5 1 3 2...
Page 118: ...118 RU 5 2 6 5 2 1 5 50 200 5 2 3 3 4...
Page 119: ...119 RU 5 2 2 6 7 7 7 C 7 D 1 2 3 4 5 6 7 8 9 10 11 12 5 3 IDN 30 7 D C B A 6...
Page 122: ...122 RU 13 14 6 6 1 10 6 2 7 7 1...
Page 123: ...123 RU 4000 8000 500 5 2 7 2 S 1 2 3 n 4 8 9 PPOM...
Page 129: ......
Page 130: ......
Page 147: ...Anota es...
Page 148: ......
Page 153: ...153 GR 10 4 2 5 5 1 3 2 5 2 6...
Page 154: ...GR 154 5 2 1 5 50 200 cm 5 2 2 6 7 A 7 B 7 C 5 2 3 3 4...
Page 155: ...155 GR 7 D 1 2 3 4 5 6 7 8 9 10 11 12 5 3 IDN 30 mA 3 6 7 D C B A...
Page 158: ...GR 158 6 6 1 5 6 2 7 7 1 4000 8000 500V 5MW 2MW...
Page 159: ...159 GR 7 2 Dab Pumps 1 2 3 4 8 Dab Pumps 9 PPOM...
Page 165: ......
Page 166: ......
Page 183: ...Note...
Page 184: ......
Page 201: ...Notlar...
Page 202: ......
Page 219: ...Pozn mky...
Page 220: ......
Page 237: ...Uwagi...
Page 238: ......
Page 255: ...Anm rkningar...
Page 256: ......
Page 273: ...Huomautuksia...
Page 274: ......