GB
29
Use and maintenance instructions
English
Electric submersible pumps for sewage
5.3 ELECTRIC CONNECTIONS
Electric connections must be carried out perfectly by competent personnel complying with local safety
regulations.
Before making connections be sure that electric power is disconnected and that it cannot be reconnected
accidentally. Earth cable must be connected before network cables; in case of motor dismantling earth cables
must be disconnected at last.
Earthing shall be carried out in compliance with safety regulations and under the installer’s responsibility.
The electric control panel and relevant electric equipment must comply with safety regulstions and rules.
Instruments and components of the panel must be suitable to guarantee a reliable and lasting service. The use
of less quality or undersized equipment could cause heavy damages to the motor or / and installation.
Starting equipment, when necessary, must be in compliance with regulations and rules in force.
The electric control panel, manufactured according to the conditions of the place of installation, must be
protected against direct sunlight, located in a ventilated place without humidity and with an ambient temperature
complying with the manufacturer indications.
Should the electric pump be installed in ambients with possible presence of persons, it’s necessary to install a
differential switch with residual current (DN) = 30 mA.
5.3.1 SINGLE PHASE ELECTRIC PUMPS
Electric pumps series DRENAG 500/900, FEKA GL, DIG 1100:
Available with or without automatic floating switch. The condenser is included inside the motor. Protection is
care of the end user.
Electric pumps series FEKA:
Available with or without automatic floating switch.
Electric pumps series DRENAG 1600-3000:
Supplied with Schuko plug or English plug type “GB3” (directives B5 1363 A ). The capacitor and the manual
reset switch are in an external control panel. In case electric pump stops it is necessary to restart it manually.
Electric pumps series GRINDER M-A / M-NA:
Also available with automatic float switch.
Supplied with an electric panel in which there is a capacitor for starting the pump. Fig.8
Fig. 8
Wiring diagrams for a single-phase pump with and without float.
Fig. 9
Low tension connection scheme
Line
Common
Condenser
Consense
Capacitor
Brown
Blue
Brown
Blue
Black
Yellow-green
Brown
Yellow-green
Yellow-green
Blue
Brown
Blue
Power
Float
Pump
Capacitor
Brown
Blue
Blue
Blue
Brown
Black
Yellow-green
Yellow-green
Yellow-green
Power
Brown
Pump
Summary of Contents for GRINDER GL
Page 2: ......
Page 4: ......
Page 21: ...Note...
Page 22: ......
Page 39: ...Notes...
Page 40: ......
Page 57: ...Notes...
Page 58: ......
Page 75: ...Notizen...
Page 76: ......
Page 93: ...Notas...
Page 94: ......
Page 111: ...Notities...
Page 112: ......
Page 115: ...115 RU i EN 60335 1 02 I 70 3 3 1 6 11 2 1 Dab Pumps 40 C 104 F 8 FEKA GRINDER...
Page 117: ...117 RU 4 4 1 125 127 10 4 2 5 5 1 3 2...
Page 118: ...118 RU 5 2 6 5 2 1 5 50 200 5 2 3 3 4...
Page 119: ...119 RU 5 2 2 6 7 7 7 C 7 D 1 2 3 4 5 6 7 8 9 10 11 12 5 3 IDN 30 7 D C B A 6...
Page 122: ...122 RU 13 14 6 6 1 10 6 2 7 7 1...
Page 123: ...123 RU 4000 8000 500 5 2 7 2 S 1 2 3 n 4 8 9 PPOM...
Page 129: ......
Page 130: ......
Page 147: ...Anota es...
Page 148: ......
Page 153: ...153 GR 10 4 2 5 5 1 3 2 5 2 6...
Page 154: ...GR 154 5 2 1 5 50 200 cm 5 2 2 6 7 A 7 B 7 C 5 2 3 3 4...
Page 155: ...155 GR 7 D 1 2 3 4 5 6 7 8 9 10 11 12 5 3 IDN 30 mA 3 6 7 D C B A...
Page 158: ...GR 158 6 6 1 5 6 2 7 7 1 4000 8000 500V 5MW 2MW...
Page 159: ...159 GR 7 2 Dab Pumps 1 2 3 4 8 Dab Pumps 9 PPOM...
Page 165: ......
Page 166: ......
Page 183: ...Note...
Page 184: ......
Page 201: ...Notlar...
Page 202: ......
Page 219: ...Pozn mky...
Page 220: ......
Page 237: ...Uwagi...
Page 238: ......
Page 255: ...Anm rkningar...
Page 256: ......
Page 273: ...Huomautuksia...
Page 274: ......