PRE-WIRE
Remote Rooms
This section is an overview of the pre-wiring that that should be done during construction and
prior to installation for the Remote Room sections of the system.
NOTE: This section assumes that the AVR21EN, AVH21(s) and WPS21(s) are all in the same
location.
AVH21
KP 1-20 (KP21 Keypads) –
Pull a home run of CAT5e cable from each KP21 keypad location to
the appropriate AHV21 for zone control and digital audio distribution to the Remote Rooms
Video Output
– Pull a home run of RG6 coaxial cable from the video display location in each
Remote Room to the appropriate AVH21.
Video Input (Cam 1-7)
– Pull a home run of RG6 coaxial cable from each video camera location
to the AVH21 #1.
Door 1
– Pull two-conductor 24-18AWG stranded wire from the door entry device to be controlled
by ‘Door 1’ to the appropriate AVH21.
Door 2
– Pull two-conductor 24-18AWG stranded wire from the door entry device to be controlled
by ‘Door 2’ to the appropriate AVH21.
NOTE: If using two AVH21 A/V Hubs up to four door entry devices can be controlled. If using
three AVH21 A/V Hubs up to six door entry devices can be controlled. Pull two-conductor 24-
18AWG stranded wire from the additional door entry devices to the AVH21 Hubs as required.
WPS21
KP 1-20 –
Pull four-conductor, 14-AWG (recommended for use at wire length distances up to 300
feet between WPS21 and KP21) or 16AWG (up to 150 feet) stranded wire from each KP21
keypad location to the appropriate WPS21(s) to provide power to the keypad.
KP21
AUX-IN –
Pull shielded stereo audio cable from the keypad location in a zone to where a local
device (DVD/CD player, video game, local Cable/Satellite receiver) or wall plate will be installed
in that zone.
PRE-OUT
- Pull shielded stereo audio cable from the keypad location in a zone to where a local
device (high power amplifier or powered subwoofer) or wall plate will be installed in that zone.
NOTE: All other connections will be done after construction and installation are finished. See
also: AVH21 Connections, WPS21 Connections and KP21 Connections for additional information.
Summary of Contents for AVR21EN
Page 1: ...1 INSTALLATION INSTRUCTIONS...
Page 41: ...41 AVR21ENR1 FUNCTION LIST Figure 8 AVR21ENR1 Button Locations...
Page 156: ...156 KP21R ZONE REMOTE FUNCTION LIST Figure 84 KP21R Button Locations...
Page 159: ...159 Figure 86 Typical Three Zone System...
Page 161: ...161 Figure 87 Typical Hub System...
Page 164: ...164 Figure 90 Multiple Hub Power Connections...