![Aquaread LeveLine Instruction Manual Download Page 59](http://html.mh-extra.com/html/aquaread/leveline/leveline_instruction-manual_2960648059.webp)
LeveLine
®
Instruction Manual
10401-01026 Rev D
4.11.6.1. Scheduled Deployment
To schedule a time and date for the Probe to start logging data, adjust the time and date
fields on this screen using the up/down and left/right arrow keys. This time obviously needs
to be in the future. If you input a time and date that has already passed, the Probe will start
logging data immediately.
If you want to log data for a specific period of time after the start, set the logging duration (in
whole hours). If you want the Probe to log data indefinitely, set the Duration field to 00000.
Once the start time, date and optional duration have been set up, transfer the settings to
the Logger by pressing the OK key.
After successful setup, the 'ACTION SUCCESSFUL' message will be displayed. Use the
[ESC] key to leave this page after transfer. If you press the [ESC] key before pressing [OK],
your revised settings will not be transferred to the Logger.
4.11.6.2. Manual Deployment
If you are not certain of the exact time and date you want to start logging, the Logger can
be set up for manual deployment. This involves setting up the logging interval and optional
logging duration, then forcing the logger to start logging at the exact time of deployment
using a PC running LeveLink
™
software, a LeveLine
®
Meter or a QuickDeploy
™
Key.
To setup the Probe for manual deployment, set the Time field to 00:00:00 and the Date field
to ==/===/==. Finally, select the number of hours you want to log data for.
If you want to log data for a specific period of time after logging is manually started, set the
logging duration (in whole hours). If you want the Probe to log data indefinitely, set the
Duration field to 00000.
Once the start time, date and optional duration have been set up, transfer the settings to
the Logger by pressing the OK key.
After successful setup, the 'ACTION SUCCESSFUL' message will be displayed. Use the
[ESC] key to leave this page after transfer. If you press the [ESC] key before pressing [OK],
your revised settings will not be transferred to the Logger.
Remember to subsequently start the LeveLine
®
logging when you deploy it!
See
sections
for further details of on-site deployment.
4.11.7. Manual Logging Start and Stop using the Meter
On the Probe Status screen, the bottom line indicated whether the Probe is currently
logging data or not.
PROBE STATUS
3
D
Records:006216
Battery:96.0%
Logging:NO
4.11.7.1. Start Logging Manually
To manually start the Probe logging, press the
MENU
key to get to the Main Menu, then
choose
Probe Deployment.
The Probe Deployment screen will be shown.
© 2019 Aquaread
®
Ltd.
www.aquaread.com
Page 59 of 90