![Aquaread LeveLine Instruction Manual Download Page 26](http://html.mh-extra.com/html/aquaread/leveline/leveline_instruction-manual_2960648026.webp)
LeveLine
®
Instruction Manual
10401-01026 Rev D
2.8.8. Manual Logging Start using LeveLink™
If, having set up the logging interval and duration (if required) as detailed in the previous
section, you subsequently want to start the LeveLine
®
logging, click the 'Start Logging Now'
button.
After a few seconds the 'Logging Status' will change to 'Logging', the End Time and Date
will be populated (if you have set a logging duration) and the 'Start Logging Now' button will
change to 'Stop Logging Now'. To stop logging manually, click this button.
2.8.9. Overriding a Scheduled Logging Start
If you have set up a scheduled logging start time and date but subsequently want to start
logging earlier, the scheduled start can be overridden at any time by performing a manual
start using a PC running LeveLink
™
, a LeveLine
®
Meter or a QuickDeploy
™
Key.
2.8.10. LeveLine
®
Event Logging Setup
A useful feature of the LeveLine
®
Loggers is the ability to automatically increase the logging
rate if rapid changes in either level or temperature/salinity are detected. Using this feature,
memory can be saved by using a long logging interval (say several hours or more), but any
rapid changes will be logged in full detail.
© 2019 Aquaread
®
Ltd.
www.aquaread.com
Page 26 of 90