= #"!!&@b_WbQ]cD ## D "# Q^TD "$
,QVWDOODWLRQ&KHFNOLVW
Copy or tear out this checklist, to aid in installing the MedWeld 4000.
Be certain to verify and check off each step after performing it. Also, the
responsible service technician should sign their initials after completing
each step.
Step Number
Check-off
Initials
Action to Take
CdU`!
Ensure proper lock-out at welding bus.
Circuit breaker handle DOWN.
CdU`"
Inspect interior of control for loose/missing
parts and/or damage in shipping.
CdU`#
Check drain holes; ensure they are open.
CdU`$
At desired location, mount control by ALL 4
mounting tabs.
CdU`%
Remove access plates to drill for: Weld
bus, cooling water, welding transformer and
I/O.
CdU`&
Connect cooling water supply to fittings.
CdU`'
Lock-out at welding bus. Connect power
cables: Bus to line side (top) of circuit
breaker.
CdU`(
Connect weld transformer.
CdU`)
Connect all I/O points.
CdU`!
Connect external power. WARNING! Verify
Proper connections and voltage.
CdU`!!
Make MedLAN connections.
CdU`!"
Verify CORRECT magnetic trip setting on
circuit breaker.
CdU`!#
(If using optional FieldBus communica-
tions): Configure DIP switch on daughter
board.
CdU`!$
(If using optional secondary current coil):
Inspect and verify correct orientation and
secure connection.
Содержание MedWeld 4000
Страница 77: ...9 cdQ Y W dXU UTGU T _TYVYUT UTGU T UbQd_bµc 7eYTU b_WbQ c D D Q T D This page is intentionally left blank ...
Страница 153: ...Weld Schedules 4 54 Modified 9 17 08 MedWeld 4000 Operator s Guide M 032116 Programs T03300 T02300 and T02400 ...
Страница 255: ...Hardware Troubleshooting 9 10 Modified 9 17 08 MedWeld 4000 Operator s Guide M 032116 Programs T03300 T02300 and T02400 ...
Страница 257: ...Application Note Current Compensation 2 ML 010041 Application Note Current Compensation ...
Страница 261: ...Application Note Cascade Welding 4 ML 010041 Application Note Cascade Firing ...