704
JD700B Series User’s Guide
4
Press the
Save
soft key.
It saves the profile as a file with
.jcm
extension.
Verifying and configuring a RRH
A baseband unit (BBU) connected to a network can send and receive C&M messages to and from a RRH to
configure the RRH correctly and start it up and running successfully. Using the Alcatel-Lucent BBU
Emulation feature of JD700B series, you can work with the RRH, without connecting to a BBU, to configure
it correctly as if you do from the BBU.
Connecting cables
Before starting to verify RRH configuration using your CellAdvisor as a BBU, you need to make the Term
mode cable connection as illustrated in Figure 420 and configure the instrument.
Figure 420 Term mode connection diagram
With nTap:
Without nTap:
NOTE
When your CellAdvisor has two SFP transceivers installed in Port 1 and Port 2, you must
connect the cables to the SFP in Port 1 because BBU emulation in FW3.060 supports
and works with Port 1 only.
Setting CellAdvisor for Alcatel-Lucent BBU emulation
After you have made the Term mode cable connection, you need to get your CellAdvisor ready to work as a
BBU.
Procedure
1
Press the
BBU Emulation
>
Alcatel-Lucent
softt key.
2
Select
Configuration Verification > Carrier Information
.
3
Once you change the measure mode in step
2
, the instrument automatically sets itself to be
ready for the communication with the RRH and starts to update the screen with retrieved RRH
profile, including RRH and carrier information. Following are the indications of successful
connection that you can find on the screen:
The status of RRH connection changes to “
RRH Connection: On
”.
The RRH symbol (
) appears in the system status bar at the top.
4
If you do not have these indicators on the screen, press the
MEASURE SETUP
hot key and
check the following parameters have been set up correctly:
Laser:
On
Содержание CellAdvisor JD700B Series
Страница 2: ...CellAdvisorTM JD700B Series FW3 120 User s Guide ...
Страница 105: ...Chapter 4 Using Spectrum Analyzer 104 JD700B Series User s Guide Figure 44 PIM detection for multiple carriers ...
Страница 406: ...Chapter 11 Using EV DO Signal Analyzer JD700B Series User s Guide 405 3 Pilot 4 MAC 64 5 MAC 128 ...
Страница 734: ...Chapter 18 Perfroming BBU Emulation JD700B Series User s Guide 733 Figure 441 Example of verification of link status ...
Страница 763: ...Chapter 21 Performing Fiber Inspection 762 JD700B Series User s Guide Figure 461 Fiber inspection report ...
Страница 808: ...Appendix JD700B Series User s Guide 807 JD740B series ...
Страница 811: ...Appendix 810 JD700B Series User s Guide Figure 470 Append keywords window ...