Fig. 95: Dry mortarless installation into a timber wall or CLT wall, with a fire batt
1
FKRS-EU
2.4
Fire batt with ablative coating
3.11
Solid wood wall / CLT wall
4.1
Solid ceiling slab / solid floor
7.10
Trim panels (fire-resistant)
7.13
Cladding, single-layer, fire-resistant
7.14
Reinforcing board of the same material as the
wall
#
optional
*
Installation near the floor analogous to
–
Up to EI 60 S
Additional requirements: dry mortarless installation with fire batt in solid wood walls
Solid wood wall or CLT wall
Fire batt systems, installation details, distances / dimensions, see
f
≥
200 mm distance between two fire dampers in separate installation openings
Installation
Solid wood walls > Dry mortarless installation with fire batt
Fire damper Type FKRS-EU
112
Содержание FKRS-EU
Страница 176: ...Fire damper Type FKRS EU 176...