Lightweight partition wall or compartment wall, see
5.5.6 Dry mortarless installation with installation kit GL / GL2 during the wall construc-
tion
Fig. 67: Direct dry mortarless installation into a lightweight partition wall, with installation kit GL / GL2
1
FKRS-EU
2.12
Installation kit GL / GL2
2.19
Joint filler (filler, ready-to-use putty or equivalent)
3.2
Lightweight partition wall with metal support
structure, cladding on both sides
5.1
Pre-drill dry wall screw 4
×
35 mm at a distance of
approx. 100 mm with 3 mm
6.5
Mineral wool (depending on wall construction)
7.1
U-channel section according to wall construction,
W = 44 – 50 mm, H
≥
40 mm, e.g. UW section
Up to EI 90 S
Note:
Gaps between the installation kit GL / GL2 and the wall cladding must be filled with joint filler (2.19), matching
the wall cladding.
Additional requirements: dry mortarless installation with installation kit GL / GL2 during the wall construc-
tion of lightweight partition and compartment walls
Lightweight partition wall or compartment wall, see
Installation kit GL / GL2, see
≥
75 mm distance from the fire damper to load-bearing structural elements (structure
≥
90 mm)
≥
200 mm distance between two fire dampers
1.
Screw metal sections onto installation kit GL / GL2.
2.
Fix fire damper and clad the wall up to the installation kit. Make sure that the distance from the connecting
spigot on the operating side to the wall is 215 mm.
3.
Chamfer the outer layer of the cladding all round on both sides and completely fill the surrounding gap on both
sides with filler to the depth of the cladding.
4.
Screw metal sections onto both sides over the cladding, spaced approx. 100 mm apart.
Installation
Lightweight partition walls and compartment wall... > Dry mortarless installation with installation ...
Fire damper Type FKRS-EU