Fig. 86: Dry mortarless installation with fire batt into a half-timbered construction
1
FKRS-EU
2.4
Fire batt with ablative coating
3.5
Half-timbered construction, cladding on both
sides
4.1
Solid ceiling slab / solid floor
6.8
Infill (cavities completely filled with mineral wool
≥
1000 °C,
≥
50 kg/m³, or bricks, aerated con-
crete, lightweight concrete, reinforced concrete
or clay)
6.10
Ablative coating around the perimeter,
d = at least 2.5 mm
6.19
Mineral wool > 1000 °C, > 80 kg/m³,
thickness = 20 mm, panel material around the
perimeter, leave out the actuator and release
mechanism; inspection openings must remain
accessible
6.20
Sleeve (can be ordered separately)
6.24
Elastomeric foam (flame-resistant, non-drip-
ping)
The following applies in Germany: For notes
on the use of elastomeric foams, see
.
7.9
Half-timbered construction
7.11
Trim panels, fire-resistant, double layer, stag-
gered joints
7.13
Cladding
7.14
Reinforcing board of the same material as the
wall
*
6.19, 6.20 or 6.24 as an alternative
**
Installation near the floor analogous to
–
Half-timbered wall
NW
[mm]
Fire resistance properties
to
Coating
Detail
Installation side
A
Operating side
B
100 – 200
EI 90 S
–
–
,
100 – 315
EI 90 S
–
x
,
100 – 200
EI 120 S
–
x
,
100 – 315
EI 120 S
x
x
,
100 – 315
EI 30 S
–
–
,
Installation
Lightweight partition walls with timber support ... > Dry mortarless installation with fire batt
Fire damper Type FKRS-EU