5.11.10 Dry mortarless installation with installation block ER
Fig. 121: Dry mortarless installation with installation block ER in solid ceiling slab, upright and suspended
1
FKRS-EU
2.18
Installation block ER with cover plate
4.1
Solid ceiling slab
5.8
Wallplug with fire protection suitability certifi-
cate, alternatively push through installation
–
Up to EI 90 S
Additional requirements: dry mortarless installation with installation block ER in solid ceiling slabs
Solid wall
Installation block ER, see
≥ 75 mm distance between installation block and load-bearing structural elements
≥ 200 mm distance between two installation blocks
1.
Create an appropriate opening with
Æ
2.
Position the fire damper with the installation block in the centre of the installation opening and push it in up to
the cover plate.
3.
Fix the cover plate with four threaded rods (push through installation) or with at least four M6 screws. For solid
walls and solid ceiling slabs, suitable steel anchors with building inspectorate approval must be used.
Installation
Solid ceiling slabs > Dry mortarless installation with installation ...
Fire damper Type FKRS-EU
140
Содержание FKRS-EU
Страница 176: ...Fire damper Type FKRS EU 176...