5.7.2 Dry mortarless installation with installation kit TQ / TQ2
Fig. 91: Dry mortarless installation into a solid wood wall or CLT wall, with installation kit TQ / TQ2
1
FKRS-EU
2.11
Installation kit TQ / TQ2 with cover plate (two-
part with TQ2)
3.11
Solid wood wall / CLT wall
4.1
Solid ceiling slab / solid floor
6.2
Mineral wool,
≥
1000 °C,
≥
80 kg/m³, alternatively
gypsum mortar (to even out an uneven ceiling or
floor)
7.10
Trim panels
7.13
Cladding, single-layer, fire-resistant
#
optional
*
Installation near the floor analogous to
–
Up to EI 90 S
Additional requirements: dry mortarless installation with installation kit TQ / TQ2 into solid wood walls
Solid wood wall or CLT wall
Installation kit TQ / TQ2, see
≥
200 mm distance between two fire dampers in separate installation openings
Installation
Solid wood walls > Dry mortarless installation with installation ...
Fire damper Type FKRS-EU
109
Содержание FKRS-EU
Страница 176: ...Fire damper Type FKRS EU 176...