Fig. 47: Dry mortarless installation into a solid wall, with a fire batt, flange to flange, illustration shows side by side
installation (applies also to installation of dampers on top of each other)
1
FKRS-EU
2.4
Fire batt with ablative coating
3.1
Solid wall
4.1
Solid ceiling slab
6.10
Ablative coating around the perimeter,
d = at least 2.5 mm
6.19
Mineral wool > 1000 °C, > 80 kg/m³,
thickness = 20 mm, panel material around the
perimeter, leave out the actuator and release
mechanism; inspection openings must remain
accessible
6.20
Sleeve (can be ordered separately)
6.24
Elastomeric foam (flame-resistant, non-drip-
ping)
The following applies in Germany: For notes
on the use of elastomeric foams, see
.
#
Optional, according to installation details
*
6.19, 6.20 or 6.24 as an alternative
**
Installation near the floor analogous to
–
Note:
The fire resistance properties of depend on the nominal width and 6.10*.
Installation
Solid walls > Dry mortarless installation with fire batt
Fire damper Type FKRS-EU
60
Содержание FKRS-EU
Страница 176: ...Fire damper Type FKRS EU 176...