![Siemens Solkor 7PG2113 Скачать руководство пользователя страница 259](http://html.mh-extra.com/html/siemens/solkor-7pg2113/solkor-7pg2113_technical-manual_382683259.webp)
7PG2113/4/5/6 Commissioning & Maintenance
©2012 Siemens Protection Devices Limited
Chapter 6 Page 61 of 77
50BF Setting (xIn)
Test Current
50BF-1 Delay……………
50BF-2 Delay……………….
(110%)………….
(90%)…………...
No Operation
□
No Operation
□
50BF CB Faulty
Operation No Delay
□
Operation
No
Delay
□
50BF-I4 Setting
(xIn)
Test Current
50BF-1 Delay……………
50BF-2 Delay……………….
(110%)………….
(90%)…………...
No Operation
□
No Operation
□
50BF CB Faulty
Operation No Delay
□
Operation
No
Delay
□
Table 3.1-1
50BF operation
If the circuit breaker can also receive a trip signal from a protection function where there is no increase in current,
this trip input should be mapped to
50BF Mech Trip
in the INPUT CONFIG>INPUT MATRIX menu.
Initiate this binary input and simulate the circuit breaker remaining closed by ensuring the CB Closed binary Input
is energised and ensure operation of the 50BF-1 and 50BF-2 outputs after their programmed delays.
50BF Mech Trip
50BF-1 Delay……………
50BF-2 Delay……………….
CB Closed
CB Open
No Operation
□
No Operation
□
Table 3.1-2
50BF Mech Trip
3.1.1
Element Blocking
The CB Fail function can be blocked by Binary Input Inhibit. This functionality should be checked.
Element BI
Inhibits
50BF
Table 3.1-3
50BF Element Blocking