4. WIRING
IMR01Y35-E3
14
3.
Turn on the Termination resistor transfer switch in the terminal base.
The COM-JG is shipped from the factory with the selector switch set to “ON: Termination
resistor connected.”
Termination resistor
transfer switch
Termination
resistor
ON
(120
Ω
1/2 W)
Termination
resistor
OFF
Factory set value
:
ON
OF
F
ON
A terminal base of the state which removed module mainframe
4.
Push the mainframe thus separated in the terminal base until firmly locked.
Terminal base
Mainframe
Push the module
mainframe until
firmly locked
Mounting the module mainframe
Содержание COM-JG
Страница 1: ...IMR01Y35 E3 COM JG For SRZ RKC INSTRUMENT INC PROFIBUS Communication Converter Instruction Manual ...
Страница 81: ...8 USAGE EXAMPLE IMR01Y35 E3 75 5 If the PLC is registered the display becomes as follows ...
Страница 125: ...The first edition AUG 2006 IMQ00 The third edition JUL 2010 IMQ00 ...