83
OPERATING PROCEDURES
:
Check After Use
2
2.11 Check After Use
Check the following before and after every use each day.
It is recommended that a checklist is prepared and the check results are recorded.
O Check before use
1) Are there any apparent deformations or dirt which might interfere with proper operation?
Especially confirm that there are no foreign substances and dirt on the lens table.
2) Does the layout screen appear when the instrument is started?
3) Does values reads “0.0”, and are they stable (when the layout display is set to “Single:
ALM mode”)?
4) Does the blocking arm move properly when the Block button
is pressed?
5) It is recommended to calibrate the tracing unit.
See “1.6.1 Tracing unit calibration” (Page 23) for the calibration procedure.
O Check after use
1) Is the power turned OFF?
2) Is the cover of the tracing unit closed?
3) Is the ICE-1000 dirty or damaged?
4) Are all the accessories accounted for and free from damege?
Accessories; Pattern setting unit, Standard frame, Standard pattern
Содержание ICE-1000
Страница 1: ...INTELLIGENT BLOCKER Model ICE 1000 OPERATOR S MANUAL...
Страница 8: ...VI...
Страница 114: ...104 SPECIFICATIONS AND ACCESSORIES Standard Configuration 5 3 2 Optional accessories Barcode scanner RS 232C cable...
Страница 116: ...106 INDEX...