Section 2 - Initial Setup and Calibration
90-8M8022154 APRIL 2008
Page 25
NOTE: The "TANK SETUP" screen shown is for a triple engine configuration that contains
center tank positions. Quad applications will show additional positions for starboard center
and port center tanks.
1. Press the check button to enter tank setup.
2. Press the left or right arrow on the arrow trackpad until the tank
type
is shown for that
particular tank. The available options for each tank are:
•
"NOT USED"
•
"FUEL"
•
"OIL"
•
"WATER"
•
"WASTE"
32781
3. Press the down arrow to proceed to the next tank.
4. Perform steps 2 and 3 for all remaining tanks on the vessel.
5. Confirm your selections by pressing the check button. The next screen will appear
asking for the known capacities of each tank.
NOTE: Tank types have now been confirmed.
6. Press the left or right arrow on the arrow trackpad until the tank
capacity
is shown for
that particular tank.
NOTE: Pressing and holding an arrow causes the numeric increments to speed up. Left
arrow causes the number to decrease; right arrow causes the number to increase.
Содержание VesselView
Страница 7: ...Page iv 90 8M8022154 APRIL 2008...
Страница 54: ...Section 3 VesselView Race Edition Screen Overview Notes 90 8M8022154 APRIL 2008 Page 47...
Страница 137: ...Section 5 Propulsion Menu Notes Page 130 90 8M8022154 APRIL 2008...
Страница 145: ...Section 6 Vessel Menu Notes Page 138 90 8M8022154 APRIL 2008...
Страница 160: ...Section 8 Installation and Wiring Notes 90 8M8022154 APRIL 2008 Page 153...
Страница 166: ...Section 8 Installation and Wiring Notes 90 8M8022154 APRIL 2008 Page 159...
Страница 170: ...Section 8 Installation and Wiring Notes 90 8M8022154 APRIL 2008 Page 163...
Страница 178: ...Section 8 Installation and Wiring Notes 90 8M8022154 APRIL 2008 Page 171...
Страница 183: ...Section 8 Installation and Wiring Notes Page 176 90 8M8022154 APRIL 2008...
Страница 185: ...Section 8 Installation and Wiring Notes Page 178 90 8M8022154 APRIL 2008...