About this document
Leuze electronic GmbH + Co. KG
CML 730i
11
1
TIB (total of interrupted beams)
2
TNIB (total of not interrupted beams)
3
LIB (Last interrupted beam )
4
LNIB (Last not interrupted beam)
5
FNIB (First not interrupted beam)
6
FIB (First interrupted beam)
Figure 1.1: Definition of terms
1
6
3
2
2
5
4