2KR/2KS
1-2-2
1-2-2 Unpacking and installation
(1) Installation procedure
Unpack.
Remove the tapes and pad.
Install the optional paper feeder.
Release the lever holding mirror 1 and 2 frames.
Install the toner container.
Connect the power cord.
Installing toner.
Install the optional original cover or the DP.
Install other optional devices.
Print out the user setting list.
Make test copies.
Output an own-status report
(maintenance item U000).
Attaching the language label
(230 V specifications only).
Exit maintenance mode.
Start
Load paper.
Install the waste toner box.
Setting the delivery date
(maintenance item U278).
Release of cassette lift plate.
Completion of the machine installation.
Содержание TASKalfa 420i
Страница 1: ...SERVICE MANUAL Published in May 2010 842KS113 2KSSM063 Rev 3 TASKalfa 420i TASKalfa 520i ...
Страница 4: ...This page is intentionally left blank ...
Страница 10: ...This page is intentionally left blank ...
Страница 14: ...2KR 2KS This page is intentionally left blank ...
Страница 224: ...2KR 2KS 1 4 66 This page is intentionally left blank ...
Страница 328: ...2KR 2KS 2 3 30 This page is intentionally left blank ...
Страница 371: ...INSTALLATION GUIDE FOR PAPER FEEDER ...
Страница 381: ...INSTALLATION GUIDE FOR 3000 SHEETS PAPER FEEDER ...
Страница 436: ...INSTALLATION GUIDE FOR CENTER FOLDING UNIT ...
Страница 450: ...INSTALLATION GUIDE FOR MAILBOX ...
Страница 458: ...INSTALLATION GUIDE FOR HOLE PUNCH UNIT ...
Страница 470: ...INSTALLATION GUIDE FOR BUILT IN FINISHER ...
Страница 483: ...INSTALLATION GUIDE FOR JOB SEPARATOR ...
Страница 491: ...INSTALLATION GUIDE FOR FAX System ...
Страница 507: ......
Страница 508: ......