7. Check that the installation conforms to the instructions in user’s manual. The drive must
be installed in an upright position.
8. Check that the external connection terminals are tightly fastened and the torque is
appropriate.
9. Check that there are no screws, cables and other conductive items left in the inverter. If
not, get them out.
2.6 Basic commission
Complete the basic commissioning as followings before actual utilization:
1. Select the motor type, set correct motor parameters and select control mode of the
inverter according to the actual motor parameters.
2. Autotune. If possible, de-coupled from the motor load to start dynamic autotune. Or if not,
static autotune is available.
3. Adjust the ACC/DEC time according to the actual running of the load.
4. Commission the device via jogging and check that the rotation direction is as required. If
not, change the rotation direction by changing the wiring of motor.
5. Set all control parameters and then operate.
Содержание GD300-004G-4
Страница 1: ...3...
Страница 148: ...Goodrive300 inverters Basic operation instruction 147...
Страница 159: ...Goodrive300 inverters Basic operation instruction 158...
Страница 164: ...Goodrive300 inverters Basic operation instruction 163...
Страница 173: ...Goodrive300 inverters Basic operation instruction 172...
Страница 189: ...Goodrive300 inverters Basic operation instruction 188...
Страница 204: ...Goodrive300 inverters Basic operation instruction 203...
Страница 211: ...Goodrive300 inverters Basic operation instruction 210 convolution is required The working flowchart is as below...
Страница 227: ...Goodrive300 inverters Fault tracking 226 8 6 2 Motor vibration...
Страница 228: ...Goodrive300 inverters Fault tracking 227 8 6 3 Overvoltage 8 6 4 Undervoltage fault...
Страница 312: ...1 1 0 0 1 0 0 7 7 9 C E 66001 00035 201303 V1 4...