SECTION 7 –
SPRAY SYSTEMS
7-27
3. Rotate the 3-Way Boom Valve (B)
(located on the center spray section of
the front boom) to supply solution to the
rear boom.
• Rotate valve towards front of machine to supply
solution to the front boom.
• Rotate valve in the upright (vertical) position to
shut solution supply OFF.
• Rotate valve towards rear of machine to supply
solution to the rear boom.
4. On both sides of machine, loosely install
the Boom Mounting Bracket (C) to the
underside of hood (D) and insert Rear
Boom (E).
5. While maintaining position, install the
Bent Pull Hitch Pin (F) through the
aligned holes of the boom mounting
assembly on each side.
6. Ensuring the boom mounting hardware
is aligned, hand-tighten the four (4)
Boom Mounting Bolts (G) until snug on
each side.
7. Install Hairpin (H) through the end of the
previously installed Bent Pull Hitch Pin
on each side.
A
B
C
E
D
F
G
Содержание UpFront STS 16
Страница 3: ...Ladder Fuel Fill 10 21 Tall Crop Package Installation 10 24 Troubleshooting 10 37...
Страница 341: ......