7-8
SECTION 7 –
SPRAY SYSTEMS
Manual Fold
(90-ft. Spray Boom to an 80-ft. Spray Boom)
1. Press Boom Solution Valve Switches -
Sections 1 and 9 (located on the side
console) to the OFF position.
2. Remove the Securement Bolt (located
on the back side of boom) and hinge
outer section forward.
3. Secure into place with the rear Secure-
ment Bolt.
4. Repeat Steps 2-3 on opposite side of
machine.
Enabling/Disabling NORAC
®
in
the Pulse Display
-If Equipped
NOTE: Hagie Manufacturing Company
recommends turning the NORAC
Monitor OFF when traveling from
one field to the next. A power switch
is located on the back side of the
monitor.
•
To Enable
, press the corresponding
Auto or Manual Button (located on the
main “Run Screen”) to the ON (green
illuminated position).
60/80/90’ System with Outer
Extensions Manually Folded Forward
80’
Boom Solution Valve
Switches - Sections 1 and 9
(Located on the side console)
-Typical View
Securement Bolt
(Located on the back side of boom)
-Typical View
NORAC Monitor
-Typical View
Содержание UpFront STS 16
Страница 3: ...Ladder Fuel Fill 10 21 Tall Crop Package Installation 10 24 Troubleshooting 10 37...
Страница 341: ......