![Hagie UpFront STS 16 Скачать руководство пользователя страница 183](http://html2.mh-extra.com/html/hagie/upfront-sts-16/upfront-sts-16_manual_3209699183.webp)
7-42
SECTION 7 –
SPRAY SYSTEMS
Front Fill
Filling the Solution Tank
1. Pull the Front Fill Release Lever (located
beneath front end of machine) OUT
(toward operator) to unlock the Front Fill
Assembly.
2. Lower the Front Fill Assembly.
3. Remove fill port cap and connect solu-
tion supply to the Solution Tank Fill Port.
4. Rotate Solution Tank Fill Valve to the
OPEN position and fill tank to desired
level.
NOTE: Two power ports (located near the
front fill assembly) are provided for
chemical pump connection.
5.
When finished filling the tank
, close
the Solution Tank Fill Valve.
6. Remove solution supply from the Solu-
tion Tank Fill Port.
7. Reinstall fill port cap.
8. Raise the Front Fill Assembly to stored
position, ensuring it “clicks” into locked
position.
Filling the Rinse Tank
Front Fill Release Lever
(Located beneath front end of machine)
-Typical View
Front Fill Assembly
(Lowered position shown)
-Typical View
• Solution
Tank Fill Port
• Solution Tank
Fill Valve
Power Ports
(Located near front fill assembly)
-Typical View
Содержание UpFront STS 16
Страница 3: ...Ladder Fuel Fill 10 21 Tall Crop Package Installation 10 24 Troubleshooting 10 37...
Страница 341: ......