![Hagie UpFront STS 16 Скачать руководство пользователя страница 305](http://html2.mh-extra.com/html/hagie/upfront-sts-16/upfront-sts-16_manual_3209699305.webp)
10-5
SECTION 10 –
MISCELLANEOUS
4. Connect air supply to jack.
5. Tap air supply handle and slowly insert
jack into Lifting Point Containment Ring.
6. Once jack is fully seated into the Lifting
Point Containment Ring, continue to
press and hold air supply handle until the
machine reaches desired height.
7. Install Lock Pins to the base of jack.
8. Reverse steps to lower machine.
Align Jack with Lifting
Point Containment Ring
-Typical View
Insert Jack into Lifting
Point Containment Ring
-Typical View
WARNING
Ensure lock pins are fully inserted at
base of jack. Do not rely on jack air
supply to support a raised machine.
Sudden loss of air pressure will cause
the machine to become unstable,
resulting in serious injury or death.
Lock Pin Installation
-Typical View
Содержание UpFront STS 16
Страница 3: ...Ladder Fuel Fill 10 21 Tall Crop Package Installation 10 24 Troubleshooting 10 37...
Страница 341: ......