![Hagie UpFront STS 16 Скачать руководство пользователя страница 201](http://html2.mh-extra.com/html/hagie/upfront-sts-16/upfront-sts-16_manual_3209699201.webp)
7-60
SECTION 7 –
SPRAY SYSTEMS
12. Turn the Master Spray Switch (located
on the Hydrostatic Drive Control Handle)
ON.
NOTE: When the Master Spray Switch is
ON, a Master Spray Indicator
(located on the Machine Display
Home Page - Field Mode) will
illuminate.
13. Press the individual Boom Solution Valve
Switches (located on the side console) to
the ON (non-illuminated) position.
NOTE: Each Boom Solution Valve Switch is
equipped with an indicator light and
will illuminate when the
corresponding Boom Solution Valve
is OFF.
14. Slowly move the Hydrostatic Drive Con-
trol Handle forward to obtain desired
ground speed.
15. Frequently observe the pressure gauge.
If the pressure drops to zero or spray
pattern deteriorates, turn OFF the Mas-
ter Spray, Solution Pump Switch, and
Main Tank Valve Switch until solution is
refilled.
Injection Pump Calibration
1. Calibrate the Injection Pump(s) (located
near the bottom of chemical tank(s)).
NOTE: Refer to the Raven manufacturer’s
operation manual for information on
injection pump calibration.
Master Spray Switch
(Located on the Hydrostatic
Drive Control Handle)
-Typical View
Master Spray Indicator
(Located on the Machine Display
Home Page - Field Mode)
Boom Solution Valve Switches
(Located on the side console)
-Typical View
Содержание UpFront STS 16
Страница 3: ...Ladder Fuel Fill 10 21 Tall Crop Package Installation 10 24 Troubleshooting 10 37...
Страница 341: ......