Inspection and Maintenance — GEK 107048
Standard Practices
SP-16
Tool Name
Figure
Quantity
Application
Tool, Transition Piece
Go/No — Go Gauge
Measure Transition Piece to First-Stage
Nozzle Retaining Ring clearances
1
2-12
Alignment Fixture
For Aligning Accessory Gear to Turbine
1
2-13
Fuel Nozzle Staking Tool
Stake Lockplate to Fuel Nozzle Body and
Outer Tip
1
2-14
Combustion Liner Puller
For Removal of Combustion Liners From
Combustion Casing
1
2-15
Rail Fabrication Hoist
For Turbine Casing Removal and Installation
1
2-16
Beam, Lifting
For Turbine Casing and Exhaust Frame
Removal and Installation
1
2-17
Sling, Cable
For Turbine Casing and Exhaust Frame
Removal and Installation
4
2-18
Hoist, Trolley
Used With Hoist Rail Fabrication For Turbine
Casing and Exhaust Frame Removal and
Installation
1
2-19
Shackle, Anchor
Used For Turbine Casing and Exhaust Frame
Removal and Installation
11
2-20
Hook, Clevis Foundry
Used For Turbine Casing and Exhaust Frame
Removal and Installation
4
2-21
Ratchet, Gear
Come-Along
Used For Turbine Casing and Exhaust Frame
Removal and Installation
2
2-22
Link, Connection
Used For Turbine Casing and Exhaust Frame
Removal and Installation
4
2-23
Hook, Clevis Grab
Used For Turbine Casing and Exhaust Frame
Removal and Installation
2
2-24
Sling, Chain
Used for Turbine Casing and Exhaust Frame
Removal and Installation
2
2-25
Rail Fabrication Hoist
For Turbine Casing and Exhaust Frame
Removal and Installation
1
2-26
Pulley
For Second and Third-Stage Nozzle Segment
Removal
3
2-27
Borescope Kit
Used for Borescope Inspection on Gas
Turbine
1
2-28
Rail Channel Trolley
Used in the Accessory Compartment for
Component Lifts
1
2-29
Beam Lifting Inlet Duct
Used for Lifting Inlet Silencer
1
2-30
Beam Lifting Inlet Duct
Used for Lifting Inlet Transition Piece
1
2-31
Beam Lifting Inlet Duct
Used for Lifting Inlet Elbow Section
1
2-32
Содержание MS6001B
Страница 2: ...Gas Turbine Inspection and Maintenance GEK 107048 I 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 4: ...Inspection and Maintenance Note THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 12: ...Inspection and Maintenance Notes Cautions and Warnings viii THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 13: ...INSERT TAB INTRODUCTION ...
Страница 14: ......
Страница 25: ...INSERT TAB STANDARD PRACTICES ...
Страница 26: ......
Страница 57: ...Standard Practices Inspection and Maintenance GEK 107048 SP 31 Figure 2 26 Rail Fabrication Hoist ...
Страница 58: ...Inspection and Maintenance GEK 107048 Standard Practices SP 32 Figure 2 27 Pulley Nozzle Segments ...
Страница 59: ...Standard Practices Inspection and Maintenance GEK 107048 SP 33 Figure 2 28 Typical Borescope Kit ...
Страница 60: ...Inspection and Maintenance GEK 107048 Standard Practices SP 34 Figure 2 29 Rail Channel Trolley ...
Страница 61: ...Standard Practices Inspection and Maintenance GEK 107048 SP 35 Figure 2 30 Lifting Beam Inlet Silencer ...
Страница 62: ...Inspection and Maintenance GEK 107048 Standard Practices SP 36 Figure 2 31 Lifting Beam Inlet Transition ...
Страница 63: ...Standard Practices Inspection and Maintenance GEK 107048 SP 37 Figure 2 32 Lifting Beam Inlet Elbow ...
Страница 66: ...Inspection and Maintenance GEK 107048 Standard Practices SP 40 Figure 2 38 Tubing Insert and Male Connector ...
Страница 86: ...Inspection and Maintenance GEK 107048 Standard Practices SP 60 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 87: ...INSERT TAB AUXILIARY CONTROLS SYSTEMS MAINTENANCE ...
Страница 88: ......
Страница 90: ...Auxiliary and Controls Systems Maintenance Inspection and Maintenance THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 104: ...Auxiliary and Controls Systems Maintenance Inspection and Maintenance ACSM 14 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 106: ...Inspection and Maintenance Procedures Inspection and Maintenance I 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 132: ...Inspection and Maintenance Procedures Inspection and Maintenance IMP 26 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 133: ...INSERT TAB SCHEDULED TURBINE MAINTENACE ...
Страница 134: ......
Страница 153: ...Scheduled Turbine Maintenance Inspection and Maintenance GEK 107048 STM 19 Figure 4 2 Borescope Light Supply ...
Страница 156: ...Inspection and Maintenance GEK 107048 Scheduled Turbine Maintenance STM 22 Figure 4 5 TV Monitor Presentation ...
Страница 157: ...INSERT TAB COMBUSTION INSPECTION ...
Страница 158: ......
Страница 160: ...Inspection and Maintenance GEK 107048 Combustion Inspection 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 239: ...INSERT TAB HOT GAS PATH INSPECTION ...
Страница 240: ......
Страница 242: ...Inspection and Maintenance GEK 107048 Hot Gas Path Inspection 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 313: ...INSERT TAB MAJOR INSPECTION ...
Страница 314: ......
Страница 316: ...Inspection and Maintenance GEK 107048 Major Inspection 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 350: ...Inspection and Maintenance GEK 107048 Major Inspection Inspection Procedures MI I 8 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 363: ...INSERT TAB MAINTENANCE FORMS ...
Страница 364: ......
Страница 370: ...Inspection and Maintenance GEK 107048 Maintenance Forms MF 6 THIS PAGE INTENTIONALLY LEFT BLANK ...