Maintenance Forms
Inspection and Maintenance — GEK 107048
MF-3
PGS/GT-FF-6410
MS-6001B DLN-1 Spark Plug — Ball Joint
PGS/GT-FF-WS01
MS-6001B DLN-1 Combustion Systems (Liner)
PGS/GT-FF-WS26
MS-6001B DLN-1 Primary Fuel Nozzle End Cover
PGS/GT-FF-WS27
MS-6001B DLN-1 Primary Fuel Nozzle
PGS/GT-FF-WS28
MS-6001B DLN-1 Secondary Fuel Nozzle
Hot Gas Path Inspection TN # 1020 (DLN-1)
PGS/GT-FF-6000
Site Information
PGS/GT-FF-6026
TIL’s/FMI’s Applied
PGS/GT-FF-6027
Renewal Parts
PGS/GT-FF-6091
MS-6001 Series First Stage Bucket, Air Cooled
PGS/GT-FF-6092
MS-6001 Second Stage Bucket, Air Cooled
PGS/GT-FF-6093
MS-6001 Third Stage Bucket
PGS/GT-FF-6094
MS-6001 Rotor Positioning Checks, Initial and Final
PGS/GT-FF-6095
MS-6001 First Stage Nozzle, Cracking and Trailing Edge Bowing
PGS/GT-FF-6096
MS-6001 Series First Stage Nozzle and Support Ring, General Conditions
PGS/GT-FF-6097
MS-6001 Series First Stage Nozzle, Ellipticity and Radial Concentricity Checks
PGS/GT-FF-6098
MS-6001 Series First Stage Shrouds, General Condition
PGS/GT-FF-6099
MS-6001 Series Second Stage Nozzle, Cracking and Trailing Edge Bowing
PGS/GT-FF-6100
MS-6001 Series Second Stage Diaphragm Seals, General Condition
PGS/GT-FF-6101
MS-6001 Series Second Stage Shrouds, General Condition
PGS/GT-FF-6102
MS-6001 Series Third Stage Nozzle, Cracking and Trailing Edge Bowing
PGS/GT-FF-6103
MS-6001 Third Stage Diaphragm Seals, General Condition
PGS/GT-FF-6104
MS-6001 Third Series Third Stage Shrouds, General Condition
PGS/GT-FF-6105
MS-6001 Turbine Rotor Clearances
PGS/GT-FF-6111
MS-6001 Series Second Stage Nozzle, General Condition
PGS/GT-FF-6112
MS-6001 Series Third Stage Nozzle, General Condition
PGS/GT-FF-6124
MS-6001 Series Unit Casing Jacking Record
PGS/GT-FF-6403
MS-6001B DLN-1 Combustion System Casing
PGS/GT-FF-6404
MS-6001B DLN-1 Combustion System (Crossfire Tube and Spring Retainers)
PGS/GT-FF-6406
MS-6001B Combustion Systems Liner (Slot Cooled Liner)
PGS/GT-FF-6407
MS-6001B Transition Piece
PGS/GT-FF-6408
MS-6001B DLN-1 Transition Piece Installed Clearances
PGS/GT-FF-6409
MS-6001B DLN-1 Series Flowsleeves
PGS/GT-FF-6410
MS-6001B DLN-1 Spark Plug — Ball Joint
PGS/GT-FF-WS01
MS-6001B DLN-1 Combustion Systems (Liner)
Содержание MS6001B
Страница 2: ...Gas Turbine Inspection and Maintenance GEK 107048 I 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 4: ...Inspection and Maintenance Note THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 12: ...Inspection and Maintenance Notes Cautions and Warnings viii THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 13: ...INSERT TAB INTRODUCTION ...
Страница 14: ......
Страница 25: ...INSERT TAB STANDARD PRACTICES ...
Страница 26: ......
Страница 57: ...Standard Practices Inspection and Maintenance GEK 107048 SP 31 Figure 2 26 Rail Fabrication Hoist ...
Страница 58: ...Inspection and Maintenance GEK 107048 Standard Practices SP 32 Figure 2 27 Pulley Nozzle Segments ...
Страница 59: ...Standard Practices Inspection and Maintenance GEK 107048 SP 33 Figure 2 28 Typical Borescope Kit ...
Страница 60: ...Inspection and Maintenance GEK 107048 Standard Practices SP 34 Figure 2 29 Rail Channel Trolley ...
Страница 61: ...Standard Practices Inspection and Maintenance GEK 107048 SP 35 Figure 2 30 Lifting Beam Inlet Silencer ...
Страница 62: ...Inspection and Maintenance GEK 107048 Standard Practices SP 36 Figure 2 31 Lifting Beam Inlet Transition ...
Страница 63: ...Standard Practices Inspection and Maintenance GEK 107048 SP 37 Figure 2 32 Lifting Beam Inlet Elbow ...
Страница 66: ...Inspection and Maintenance GEK 107048 Standard Practices SP 40 Figure 2 38 Tubing Insert and Male Connector ...
Страница 86: ...Inspection and Maintenance GEK 107048 Standard Practices SP 60 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 87: ...INSERT TAB AUXILIARY CONTROLS SYSTEMS MAINTENANCE ...
Страница 88: ......
Страница 90: ...Auxiliary and Controls Systems Maintenance Inspection and Maintenance THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 104: ...Auxiliary and Controls Systems Maintenance Inspection and Maintenance ACSM 14 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 106: ...Inspection and Maintenance Procedures Inspection and Maintenance I 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 132: ...Inspection and Maintenance Procedures Inspection and Maintenance IMP 26 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 133: ...INSERT TAB SCHEDULED TURBINE MAINTENACE ...
Страница 134: ......
Страница 153: ...Scheduled Turbine Maintenance Inspection and Maintenance GEK 107048 STM 19 Figure 4 2 Borescope Light Supply ...
Страница 156: ...Inspection and Maintenance GEK 107048 Scheduled Turbine Maintenance STM 22 Figure 4 5 TV Monitor Presentation ...
Страница 157: ...INSERT TAB COMBUSTION INSPECTION ...
Страница 158: ......
Страница 160: ...Inspection and Maintenance GEK 107048 Combustion Inspection 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 239: ...INSERT TAB HOT GAS PATH INSPECTION ...
Страница 240: ......
Страница 242: ...Inspection and Maintenance GEK 107048 Hot Gas Path Inspection 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 313: ...INSERT TAB MAJOR INSPECTION ...
Страница 314: ......
Страница 316: ...Inspection and Maintenance GEK 107048 Major Inspection 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 350: ...Inspection and Maintenance GEK 107048 Major Inspection Inspection Procedures MI I 8 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 363: ...INSERT TAB MAINTENANCE FORMS ...
Страница 364: ......
Страница 370: ...Inspection and Maintenance GEK 107048 Maintenance Forms MF 6 THIS PAGE INTENTIONALLY LEFT BLANK ...