Standard Practices
Inspection and Maintenance — GEK 107048
SP-55
MS-6001B DLN-1 — Major Inspection Recommended Spare Parts (Cont’d)
Recommended
Quantity
BEARING NO. 2 ASSEMBLY (ML1502) (Cont’d)
2.
Deflector, forward Bearing No. 2
1
3.
Seal, Stationary Oil, Bearing No. 2
1
4.
Pin, Anti-Rotation, Seal
1
5.
Pin, Anti-Rotation, Seal
2
6.
Locking Plate
4
7.
Locking Plate
4
BEARING THRUST, NO. 1 BEARING (ML1507)
1.
Shim (Loaded Thrust Bearing)
1
2.
Shim (Unloaded Thrust Bearing)
1
3.
Bearing Thrust, No. 1 Bearing
1
4.
Bearing, Loaded Thrust
1
ROTOR ASSEMBLY, TURBINE (ML1305)
1.
First Stage Buckets (Complete Set)
1
2.
Pin Shank Seal, First Stage Buckets
92
3.
Pin Seal, First Stage Buckets
92
4.
Wire Lock, First Stage Buckets
1
5.
Pin Shank Seal, Second Stage Buckets
92
6.
Pin Platform Seal, Second Stage Buckets
92
7.
Wire Lock, Second Stage Buckets
1
8.
Pin Dowel, First & Second Stage Buckets (Wire Lock)
12
9.
Pin Shank Seal, Third Stage Buckets
92
10.
Pin Platform Seal, Third stage Buckets
92
11.
Lock Twist, Third Stage Buckets
92
DUCTING AND PLENUM ARRANGEMENT INLET (ML1612, A041)
Note:
The list of gaskets, nuts and bolts shown below with varying quantities,
indicates that there are different sizes required. Using the applicable
ducting and plenum arrangement inlet drawings, the user should pro-
cure the gasketing quantities shown and approximately 20% of the
hardware quantities shown to cover any hardware which may not be
reusable.
1.
Bolt, Hex Head (Plenum Arrangement) N22P25020
*30
*
2.
Washer, Plain (Plenum Arrangement) N402P43
*25
*
3.
Nut (Plenum Arrangement) N235P125
*25
*
**4.
Gasket, Duct (Plenum Arrangement)
1
Содержание MS6001B
Страница 2: ...Gas Turbine Inspection and Maintenance GEK 107048 I 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 4: ...Inspection and Maintenance Note THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 12: ...Inspection and Maintenance Notes Cautions and Warnings viii THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 13: ...INSERT TAB INTRODUCTION ...
Страница 14: ......
Страница 25: ...INSERT TAB STANDARD PRACTICES ...
Страница 26: ......
Страница 57: ...Standard Practices Inspection and Maintenance GEK 107048 SP 31 Figure 2 26 Rail Fabrication Hoist ...
Страница 58: ...Inspection and Maintenance GEK 107048 Standard Practices SP 32 Figure 2 27 Pulley Nozzle Segments ...
Страница 59: ...Standard Practices Inspection and Maintenance GEK 107048 SP 33 Figure 2 28 Typical Borescope Kit ...
Страница 60: ...Inspection and Maintenance GEK 107048 Standard Practices SP 34 Figure 2 29 Rail Channel Trolley ...
Страница 61: ...Standard Practices Inspection and Maintenance GEK 107048 SP 35 Figure 2 30 Lifting Beam Inlet Silencer ...
Страница 62: ...Inspection and Maintenance GEK 107048 Standard Practices SP 36 Figure 2 31 Lifting Beam Inlet Transition ...
Страница 63: ...Standard Practices Inspection and Maintenance GEK 107048 SP 37 Figure 2 32 Lifting Beam Inlet Elbow ...
Страница 66: ...Inspection and Maintenance GEK 107048 Standard Practices SP 40 Figure 2 38 Tubing Insert and Male Connector ...
Страница 86: ...Inspection and Maintenance GEK 107048 Standard Practices SP 60 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 87: ...INSERT TAB AUXILIARY CONTROLS SYSTEMS MAINTENANCE ...
Страница 88: ......
Страница 90: ...Auxiliary and Controls Systems Maintenance Inspection and Maintenance THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 104: ...Auxiliary and Controls Systems Maintenance Inspection and Maintenance ACSM 14 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 106: ...Inspection and Maintenance Procedures Inspection and Maintenance I 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 132: ...Inspection and Maintenance Procedures Inspection and Maintenance IMP 26 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 133: ...INSERT TAB SCHEDULED TURBINE MAINTENACE ...
Страница 134: ......
Страница 153: ...Scheduled Turbine Maintenance Inspection and Maintenance GEK 107048 STM 19 Figure 4 2 Borescope Light Supply ...
Страница 156: ...Inspection and Maintenance GEK 107048 Scheduled Turbine Maintenance STM 22 Figure 4 5 TV Monitor Presentation ...
Страница 157: ...INSERT TAB COMBUSTION INSPECTION ...
Страница 158: ......
Страница 160: ...Inspection and Maintenance GEK 107048 Combustion Inspection 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 239: ...INSERT TAB HOT GAS PATH INSPECTION ...
Страница 240: ......
Страница 242: ...Inspection and Maintenance GEK 107048 Hot Gas Path Inspection 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 313: ...INSERT TAB MAJOR INSPECTION ...
Страница 314: ......
Страница 316: ...Inspection and Maintenance GEK 107048 Major Inspection 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 350: ...Inspection and Maintenance GEK 107048 Major Inspection Inspection Procedures MI I 8 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 363: ...INSERT TAB MAINTENANCE FORMS ...
Страница 364: ......
Страница 370: ...Inspection and Maintenance GEK 107048 Maintenance Forms MF 6 THIS PAGE INTENTIONALLY LEFT BLANK ...